WORKOVER REQUIREMENTS FOR DEEPWATER SUBSEA WELLS.

被引:0
|
作者
Sizer, Phil [1 ]
O'Sullivan, Jim [1 ]
机构
[1] Otis Engineering Corp, Otis Engineering Corp
来源
Ocean industry | 1985年 / 20卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:44 / 47
相关论文
共 50 条
  • [21] WORKOVER AND RECOMPLETION OF SUBSEA COMPLETIONS IN GULF OF MEXICO
    BROWN, FM
    EVANS, CC
    JOURNAL OF PETROLEUM TECHNOLOGY, 1975, 27 (APR): : 445 - 446
  • [22] Bipolariton in quantum wells.
    Ivanov, AL
    Haug, H
    NUOVO CIMENTO DELLA SOCIETA ITALIANA DI FISICA D-CONDENSED MATTER ATOMIC MOLECULAR AND CHEMICAL PHYSICS FLUIDS PLASMAS BIOPHYSICS, 1995, 17 (11-12): : 1255 - 1264
  • [23] DESIGN OF RELIEF WELLS.
    Gupta, V.P.
    Singh, Alam
    Indian Journal of Power and River Valley Development, 1973, 23 (03): : 76 - 84
  • [24] Challenges in deepwater subsea processing
    Ditria, J
    JOURNAL OF PETROLEUM TECHNOLOGY, 2000, 52 (07): : 18 - 18
  • [25] Deepwater, subsea investments rising
    Perdue, Jeanne M.
    Petroleum Engineer International, 1997, 70 (12):
  • [26] MONITORING WELLS VS. WATER WELLS.
    Hurlburt, Scott
    Water Well Journal, 1987, 41 (12): : 43 - 44
  • [27] Choosing the Performation Density of Wells.
    Muslimov, R.Kh.
    Gabdullin, R.G.
    Oil Industry, 1983, (08): : 31 - 33
  • [28] ANALYSIS OF ARTIFICIAL RECHARGING BY WELLS.
    Asawa, G.L.
    Irrigation and Power, 1975, 32 (03): : 347 - 352
  • [29] The bacteriological examination of surface wells.
    Savage, WG
    JOURNAL OF HYGIENE, 1907, 7 (04): : 0477 - 0500
  • [30] HOW TO GROUT WATER WELLS.
    Eichelberger, Chuck
    Water Well Journal, 1988, 42 (03): : 72 - 73