共 50 条
- [42] The Optimum Reinforced Concrete Deck Stiffness of Cable-Stayed Bridge Decks [J]. 1ST INTERNATIONAL CONFERENCE ON OPTIMIZATION-DRIVEN ARCHITECTURAL DESIGN (OPTARCH 2019), 2020, 44 : 342 - 349
- [44] A study on a hybrid system of cable-stayed prestressed concrete bridge and steel suspension bridge [J]. STRAIT CROSSINGS 2001, 2001, : 61 - 66
- [46] Optimizing cable tension during construction and completion of a cable-stayed bridge [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2009, 30 (08): : 1201 - 1204
- [47] Dynamic investigation of a hybrid suspension and cable-stayed bridge [J]. EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2000, 29 (05): : 731 - 739
- [49] Study of Cable Balancing System to Replace Temporary Piers During Construction of Cable-Stayed Bridge [J]. Bridge Construction, 2020, 50 (01): : 26 - 31