Optimization of cantilever construction of cable-stayed bridge with hybrid deck system

被引:0
|
作者
Dai, Yu-Wen [1 ,2 ]
Wang, You-Yuan [2 ]
He, Jin-Ming [3 ]
机构
[1] South China University of Technology, Guangzhou,510640, China
[2] Engineering Technology Research Institute Co., Ltd., CCCC Fourth Harbor Engineering Co., Ltd., Guangzhou,510230, China
[3] The First Engineering Co., Ltd., CCCC Fourth Harbor Engineering Co., Ltd., Guangzhou,510500, China
关键词
Finite element method;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:117 / 121
相关论文
共 50 条
  • [31] Design and construction of a launched cable-stayed bridge in China
    Wang, Yingliang
    Dai, Xiaochun
    He, Tingguo
    Dai, Jianbing
    Zhang, Jiachun
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (05) : 3 - 8
  • [32] Experimental study of fatigue on orthotropic steel deck of cable-stayed bridge
    Huang, Zu-Wei
    Lei, Jun-Qing
    Gui, Cheng-Zhong
    Guo, Shu-Lun
    [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2019, 53 (06): : 1071 - 1082
  • [33] Monitoring of the Alamillo cable-stayed bridge during construction
    J. R. Casas
    A. C. Aparicio
    [J]. Experimental Mechanics, 1998, 38 : 24 - 28
  • [34] Construction and Geometry Control of Incheon Cable-Stayed Bridge
    Yang, Jong-Ho
    Im, Duk-Ki
    Kim, Chang-Hyun
    Ahn, Sang-Sup
    Lee, Wan-Soo
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 49 - 52
  • [35] Numerical analysis on stochastic buffeting of cable-stayed bridge with slotted deck
    Zhou, Qi
    Zhu, Ledong
    Zhao, Chuanliang
    [J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2014, 47 (08): : 98 - 106
  • [36] Monitoring of the Alamillo cable-stayed bridge during construction
    Casas, JR
    Aparicio, AC
    [J]. EXPERIMENTAL MECHANICS, 1998, 38 (01) : 24 - 28
  • [37] VIBRATION MEASUREMENTS ON A CABLE-STAYED BRIDGE UNDER CONSTRUCTION
    HIRSCH, G
    RUSCHEWEYH, H
    [J]. JOURNAL OF INDUSTRIAL AERODYNAMICS, 1976, 1 (03): : 297 - 300
  • [38] Optimization of Construction Process and Determination of Intermediate Cable Forces for Composite Beam Cable-Stayed Bridge
    Huang, Ersen
    Ke, Hongjun
    Hu, Huanhuan
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (09):
  • [39] Optimum Combination of Bridge and Deck Systems for Superspan Cable-Stayed Bridges
    Shao, Yi
    Shao, Xudong
    Li, Lifeng
    Wu, Jiajia
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2018, 23 (01)
  • [40] Optimum tensioning in construction state of cable-stayed bridge
    Shi, Du-Zheng
    Wang, Jin-Feng
    Xiang, Yi-Qiang
    Xu, Xing
    [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2002, 15 (02):