Causes and effects of delays in Malaysian construction industry

被引:634
|
作者
Sambasivan, Murali [1 ]
Soon, Yau Wen [1 ]
机构
[1] Graduate School of Management, Universiti Putra Malaysia, 43400 UPM Serdang Selangor, Malaysia
关键词
Contractors - Correlation methods - Project management - Turnaround time;
D O I
10.1016/j.ijproman.2006.11.007
中图分类号
学科分类号
摘要
The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. The main purpose of this study is to identify the delay factors and their impact (effect) on project completion. Earlier studies either considered the causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of specific causes on specific effects. A questionnaire survey was conducted to solicit the causes and effects of delay from clients, consultants, and contractors. About 150 respondents participated in the survey. This study identified 10 most important causes of delay from a list of 28 different causes and 6 different effects of delay. Ten most important causes were: (1) contractor's improper planning, (2) contractor's poor site management, (3) inadequate contractor experience, (4) inadequate client's finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. Six main effects of delay were: (1) time overrun, (2) cost overrun, (3) disputes, (4) arbitration, (5) litigation, and (6) total abandonment. This study has also established an empirical relationship between each cause and effect. © 2006 Elsevier Ltd and IPMA.
引用
收藏
页码:517 / 526
相关论文
共 50 条
  • [41] Digitalization in malaysian construction industry: Awareness, challenges and opportunities
    Musarat, Muhammad Ali
    Alaloul, Wesam Salah
    Zainuddin, Siti Mariam Binti
    Qureshi, Abdul Hannan
    Maqsoom, Ahsen
    RESULTS IN ENGINEERING, 2024, 21
  • [42] Integration of Quality Management System in the Malaysian Construction Industry
    Kiew, Poh Ngoh
    Ismail, Syuhaida
    Yusof, Aminah Mohd
    INNOVATION MANAGEMENT AND SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE: FROM REGIONAL DEVELOPMENT TO GLOBAL GROWTH, VOLS I - VI, 2015, 2015, : 267 - 274
  • [43] CAUSES OF DELAY IN INDIAN CONSTRUCTION INDUSTRY
    Venkatesh, M. P.
    Renuka, S. M.
    Umarani, C.
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2768 - 2773
  • [44] Coordination process in Malaysian Construction - Industry Critical Review
    Alaloul, Wesam Salah
    Liew, M. Shahir
    Zawawi, Noor Amila Abdullah
    WCIT 2014: 2ND WORLD CONFERENCE ON ISLAMIC THOUGHT & CIVILIZATION, VOLS I AND II: RISE & FALL OF CIVILIZATION, CONTEMPORARY STATES OF MUSLIM AFFAIRS, 2014, : 150 - 161
  • [45] Payment Issue in Malaysian Construction Industry: Contractors' Perspective
    Azman, Mohamed Nor Azhari
    Zaihidee, Fardila Mohd
    Nawi, Mohd Nasrun Mohd
    Kamar, Kamarul Anuar Mohamad
    Abd Hamid, Zuhairi
    Mustapha, Ramlee
    Bing, Khuan Wai
    Kiong, Tee Tze
    JURNAL TEKNOLOGI, 2014, 70 (01):
  • [46] Challenges and Advantages of Globalisation and Liberalisation in the Malaysian Construction Industry
    Ab Rani, Nur Izzati
    Ismail, Syuhaida
    Mohamed, Zainai
    ADVANCED SCIENCE LETTERS, 2018, 24 (06) : 4442 - 4445
  • [47] The Behaviour of Dispute Resolution Methods in Malaysian Construction Industry
    Chong, H. Y.
    Rosli, M. Z.
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 643 - 647
  • [48] Investigating the Awareness of Onsite Mechanization in Malaysian Construction Industry
    Waris, M.
    Liew, Mohd. Shahir
    Khamidi, Mohd. Faris
    Idrus, Arazi
    FOURTH INTERNATIONAL SYMPOSIUM ON INFRASTRUCTURE ENGINEERING IN DEVELOPING COUNTRIES, (IEDC 2013), 2014, 77 : 205 - 212
  • [49] The Implementation of Supply Chain Management in the Malaysian Construction Industry
    Abd. Shukor, Ani Saifuza
    Mohammad, Mohammad Fadhil
    Mahbub, Rohana
    Halil, Faridah Muhamad
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 395 - +
  • [50] The Identification and Management of Major Risks in the Malaysian Construction Industry
    Goh, Cheng Siew
    Abdul-Rahman, Hamzah
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (01) : 19 - 32