Causes and effects of delays in Malaysian construction industry

被引:634
|
作者
Sambasivan, Murali [1 ]
Soon, Yau Wen [1 ]
机构
[1] Graduate School of Management, Universiti Putra Malaysia, 43400 UPM Serdang Selangor, Malaysia
关键词
Contractors - Correlation methods - Project management - Turnaround time;
D O I
10.1016/j.ijproman.2006.11.007
中图分类号
学科分类号
摘要
The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. The main purpose of this study is to identify the delay factors and their impact (effect) on project completion. Earlier studies either considered the causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of specific causes on specific effects. A questionnaire survey was conducted to solicit the causes and effects of delay from clients, consultants, and contractors. About 150 respondents participated in the survey. This study identified 10 most important causes of delay from a list of 28 different causes and 6 different effects of delay. Ten most important causes were: (1) contractor's improper planning, (2) contractor's poor site management, (3) inadequate contractor experience, (4) inadequate client's finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. Six main effects of delay were: (1) time overrun, (2) cost overrun, (3) disputes, (4) arbitration, (5) litigation, and (6) total abandonment. This study has also established an empirical relationship between each cause and effect. © 2006 Elsevier Ltd and IPMA.
引用
收藏
页码:517 / 526
相关论文
共 50 条
  • [31] Factor Analysis of Construction Delays in the US Construction Industry
    Tafazzoli, Mohammadsoroush
    Shrestha, Pramen
    INTERNATIONAL CONFERENCE ON SUSTAINABLE INFRASTRUCTURE 2017: METHODOLOGY, 2017, : 111 - 122
  • [32] Causes of delays on construction projects: a comprehensive list
    Durdyev, Serdar
    Hosseini, M. Reza
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 20 - 46
  • [33] Causes of schedule delays in construction projects in Algeria
    Rachid, Zemra
    Toufik, Boudouh
    Mohammed, Baheddi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 371 - 381
  • [34] Causes of Construction Projects Delays: A qualitative analysis
    Rudeli, N.
    Viles, E.
    Gonzalez, J.
    Santilli, A.
    MEMORIA INVESTIGACIONES EN INGENIERIA, 2018, (16): : 71 - 84
  • [35] A Pilot Survey on Causes of Delay in Malaysian Construction Project
    Tawil, Norngainy Mohd
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    Arshad, Ishak
    Badaruzzaman, Wan Hamidon Wan
    BUILDING SURVEYING, FACILITIES MANAGEMENT AND ENGINEERING CONFERENCE (BSFMEC 2014), 2014, 15
  • [36] Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran
    Abbasi, Omid
    Noorzai, Esmatullah
    Jafari, Kobra Gharouni
    Golabchi, Mahmood
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2020, 26 (03)
  • [37] Late Payment and Nonpayment within the Construction Industry: Causes, Effects, and Solutions
    Peters, Everson
    Subar, Kern
    Martin, Hector
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (03)
  • [38] Sustainability Performance in Malaysian Construction Industry: A Study on the Local Construction Stakeholders
    Bin Osman, Wan Nadzri
    Salleh, Dani
    INNOVATION AND SUSTAINABLE COMPETITIVE ADVANTAGE: FROM REGIONAL DEVELOPMENT TO WORLD ECONOMIES, VOLS 1-5, 2012, : 841 - +
  • [39] Causes of Delay in Construction Industry in Iran
    Kouchaknezhad, Mehran
    Ali, Abang Abdullah Abang
    Kadir, Mohammad Razali Abdul
    INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 211 - 217
  • [40] Implementation of Building Information Modeling in Malaysian Construction Industry
    Memon, Aftab Hameed
    Rahman, Ismail Abdul
    Harman, Nur Melly Edora
    3RD INTERNATIONAL CONFERENCE ON FUNDAMENTAL AND APPLIED SCIENCES (ICFAS 2014): INNOVATIVE RESEARCH IN APPLIED SCIENCES FOR A SUSTAINABLE FUTURE, 2014, 1621 : 343 - 349