Causes and effects of delays in Malaysian construction industry

被引:634
|
作者
Sambasivan, Murali [1 ]
Soon, Yau Wen [1 ]
机构
[1] Graduate School of Management, Universiti Putra Malaysia, 43400 UPM Serdang Selangor, Malaysia
关键词
Contractors - Correlation methods - Project management - Turnaround time;
D O I
10.1016/j.ijproman.2006.11.007
中图分类号
学科分类号
摘要
The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. The main purpose of this study is to identify the delay factors and their impact (effect) on project completion. Earlier studies either considered the causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of specific causes on specific effects. A questionnaire survey was conducted to solicit the causes and effects of delay from clients, consultants, and contractors. About 150 respondents participated in the survey. This study identified 10 most important causes of delay from a list of 28 different causes and 6 different effects of delay. Ten most important causes were: (1) contractor's improper planning, (2) contractor's poor site management, (3) inadequate contractor experience, (4) inadequate client's finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. Six main effects of delay were: (1) time overrun, (2) cost overrun, (3) disputes, (4) arbitration, (5) litigation, and (6) total abandonment. This study has also established an empirical relationship between each cause and effect. © 2006 Elsevier Ltd and IPMA.
引用
收藏
页码:517 / 526
相关论文
共 50 条
  • [21] Improving construction claim management in Malaysian construction industry
    Bakhary, Nor Azmi
    Adnan, Hamimah
    Ibrahim, Azmi
    6TH INTERNATIONAL CONFERENCE OF EURO ASIA CIVIL ENGINEERING FORUM (EACEF 2017), 2017, 138
  • [22] Exploring Lean Construction Components for Malaysian Construction Industry
    Muhammad, Wan Mohd Nurdden Wan
    Ismail, Zulhabri
    Hashim, Ahmad Ezanee
    2013 IEEE BUSINESS ENGINEERING AND INDUSTRIAL APPLICATIONS COLLOQUIUM (BEIAC 2013), 2013, : 1 - 6
  • [23] CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION
    Suleiman, Akram
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (05) : 365 - 376
  • [24] Causes of miscommunication leading to project delays and low work quality in the construction industry of Saudi Arabia
    Abdallah, Asmaa Alaaeldin
    Shaawat, Mohammed Essam
    Almohassen, Abdulaziz S.
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (03)
  • [25] Project management practice and its effects on project success in Malaysian construction industry
    Haron, N. A.
    Devi, P.
    Hassim, S.
    Alias, A. H.
    Tahir, M. M.
    Harun, A. N.
    INTERNATIONAL CONFERENCE ON ARCHITECTURE AND CIVIL ENGINEERING (ICACE 2017), 2018, 291
  • [26] A review of foreign construction firm presence in the Malaysian construction industry
    Veerasanai, Rajeswari
    Alias, Anuar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (10) : 1830 - 1843
  • [27] The Adoption of IOT in the Malaysian Construction Industry: Towards Construction 4.0
    Ibrahim, Farah Salwati
    Esa, Muneera
    Rahman, Rahimi A.
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (01): : 56 - 67
  • [28] The path towards greening the Malaysian construction industry
    Bohari, Asmah Alia Mohamad
    Skitmore, Martin
    Xia, Bo
    Teo, Melissa
    Zhang, Xiaoling
    Adham, Khairul Naim
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 52 : 1742 - 1748
  • [29] Issues and Impact of Lean Construction Implementation in The Malaysian Construction Industry
    Marhani, Mohd Arif
    Othman, Nurul Ain Syafiqah Muhammad
    Ismail, Noor Akmal Addlah
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 258 - 268
  • [30] Risk of late payment in the Malaysian construction industry
    Ye, Kho Mei
    Rahman, Hamzah Abdul
    World Academy of Science, Engineering and Technology, 2010, 65 : 538 - 546