Causes of miscommunication leading to project delays and low work quality in the construction industry of Saudi Arabia

被引:1
|
作者
Abdallah, Asmaa Alaaeldin [1 ]
Shaawat, Mohammed Essam [1 ]
Almohassen, Abdulaziz S. [1 ]
机构
[1] Imam Abdulrahman Bin Faisal Univ, Coll Architecture & Planning, Dept Bldg Engn, Dammam 31441, Saudi Arabia
关键词
Miscommunication; Cronbach's alpha; Construction management; Project delay; Project management; COMMUNICATION;
D O I
10.1016/j.asej.2023.102447
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
One of the major issues in the construction industry is miscommunication among all the related people working on a project. The success of a project depends on the effectiveness of information flow, as it is believed to be the cause of irregularities in most projects. This study was undertaken to address the issue of miscommunication in the construction sector of Saudi Arabia to evaluate the root causes of miscommunication and its effects on the health of a project. A comprehensive survey was designed to seek the opinion of highly experienced experts in the construction industry regarding the matter. The obtained data was put into a three-staged statistical analysis including a reliability check through Cronbach's alpha and weighted average rating factors. The results revealed the root causes of miscommunication which pose a serious threat to a project. Also, the results showed that the major effects produced by these causes are project delay and low work quality on a construction site. The factors were organized on a fishbone diagram for better clarity. The research is beneficial for the administrative and management staff of a construction project. By deploying protective measures during the planning phase, discussed in the article, the adverse effects of miscommunication can be avoided.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Causes of material delays in capital projects in Saudi Arabia
    Shash, Ali A.
    AbuAlnaja, Fahad M.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (07) : 1109 - 1117
  • [2] An Investigation into the Causes of Payment Delays and Deliberate Delay Tactics in Public Construction Projects in Saudi Arabia
    Bageis, Abdulrahman Salem
    BUILDINGS, 2024, 14 (06)
  • [3] CONSTRUCTION-INDUSTRY IN SAUDI-ARABIA
    ALJARALLAH, MI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1983, 109 (04): : 355 - 368
  • [4] Causes and effects of delays in Malaysian construction industry
    Sambasivan, Murali
    Soon, Yau Wen
    International Journal of Project Management, 2007, 25 (05) : 517 - 526
  • [5] Assessment of the causes of delays in the UAE construction industry
    Faridi, AS
    El-Sayegh, SM
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 146 - 150
  • [6] CONSTRUCTION-INDUSTRY IN SAUDI-ARABIA - DISCUSSION
    SACRE, C
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1984, 110 (04): : 532 - 532
  • [7] CONSTRUCTION-INDUSTRY IN SAUDI-ARABIA - CLOSURE
    ALJARALLAH, MI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1984, 110 (04): : 533 - 533
  • [8] Health and Safety in Temporary Work Zone Road Construction Project in Saudi Arabia: Risks and Solutions
    Alsultan, Saleh M.
    Alqahtani, Fahad K.
    Alkahtani, Khalid F.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (17)
  • [9] Quality of Work Life (QWL) and Its Impact on the Performance of the Banking Industry in Saudi Arabia
    Ishfaq, Mohammad
    Al-Hajieh, Heitham
    Alharthi, Majed
    INTERNATIONAL JOURNAL OF FINANCIAL STUDIES, 2022, 10 (03):
  • [10] Influence of Project and Marketing Management on Delays, Penalties, and Project Quality in Slovene Organizations in the Construction Industry
    Golob, Ksenija
    Bastic, Majda
    Psunder, Igor
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (04) : 495 - 502