Causes of miscommunication leading to project delays and low work quality in the construction industry of Saudi Arabia

被引:1
|
作者
Abdallah, Asmaa Alaaeldin [1 ]
Shaawat, Mohammed Essam [1 ]
Almohassen, Abdulaziz S. [1 ]
机构
[1] Imam Abdulrahman Bin Faisal Univ, Coll Architecture & Planning, Dept Bldg Engn, Dammam 31441, Saudi Arabia
关键词
Miscommunication; Cronbach's alpha; Construction management; Project delay; Project management; COMMUNICATION;
D O I
10.1016/j.asej.2023.102447
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
One of the major issues in the construction industry is miscommunication among all the related people working on a project. The success of a project depends on the effectiveness of information flow, as it is believed to be the cause of irregularities in most projects. This study was undertaken to address the issue of miscommunication in the construction sector of Saudi Arabia to evaluate the root causes of miscommunication and its effects on the health of a project. A comprehensive survey was designed to seek the opinion of highly experienced experts in the construction industry regarding the matter. The obtained data was put into a three-staged statistical analysis including a reliability check through Cronbach's alpha and weighted average rating factors. The results revealed the root causes of miscommunication which pose a serious threat to a project. Also, the results showed that the major effects produced by these causes are project delay and low work quality on a construction site. The factors were organized on a fishbone diagram for better clarity. The research is beneficial for the administrative and management staff of a construction project. By deploying protective measures during the planning phase, discussed in the article, the adverse effects of miscommunication can be avoided.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Drivers for Sharing Knowledge in the Kingdom of Saudi Arabia Construction Industry: An Empirical Study
    Alamil, Hani
    Renukappa, Suresh
    Alosaimi, Hanouf
    Al Nabt, Saeed
    PROCEEDINGS OF 3RD INTERNATIONAL CONFERENCE ON INFORMATION SYSTEM AND DATA MINING (ICISDM 2019), 2019, : 109 - 113
  • [42] Profiling causative factors leading to construction project delays in the United Arab Emirates
    Mpofu, Bekithemba
    Ochieng, Edward Godfrey
    Moobela, Cletus
    Pretorius, Adriaan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (02) : 346 - 376
  • [43] Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia
    Almahmoud, Essam Salem
    Doloi, Hemanta Kumar
    Panuwatwanich, Kriengsak
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (03) : 296 - 307
  • [44] Influences of Project Management Capabilities on the Organizational Performance of the Saudi Construction Industry
    Sulieman, Hassan Ahmed
    Alfaraidy, Faris Abdulaziz
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (03) : 4144 - 4147
  • [45] Assessing the role and significance of project selection by the contractors in the Saudi construction industry
    Bageis, Abdulrahman
    Alsulamy, Saleh
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2021, 13 (01): : 2367 - 2373
  • [46] Exploring Project Management Office Models for Public Construction Projects in Hail, Saudi Arabia
    Alghaseb, Mohammed
    Alali, Hisham
    SUSTAINABILITY, 2024, 16 (18)
  • [47] Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia
    Ayoub, Essam
    Malek, Charles
    Helmy, Gamal
    STRUCTURAL CONCRETE, 2013, 14 (03) : 250 - 259
  • [48] An empirical study of quality management systems in the Saudi construction industry
    Aichouni, Mohamed
    Messaoudene, Noureddine Ait
    Al-Ghonamy, Abdulaziz
    Touahmia, Mabrouk
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2014, 14 (03) : 181 - 190
  • [49] Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol
    Shahsavand, Parvaneh
    Marefat, Akbar
    Parchamijalal, Majid
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (04) : 497 - 533
  • [50] Factors influencing safety performance in the construction industry of Saudi Arabia: an exploratory factor analysis
    Mosly, Ibrahim
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2022, 28 (02) : 901 - 908