Factor Analysis of Construction Delays in the US Construction Industry

被引:0
|
作者
Tafazzoli, Mohammadsoroush [1 ]
Shrestha, Pramen [1 ]
机构
[1] Univ Nevada, Dept Civil & Environm Engn & Construct, 4505 S Maryland Pkwy, Las Vegas, NV 89154 USA
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Delays in completing construction projects is one of the most common problems of the construction industry, and has a detrimental effect on all triple-bottom lines of sustainability (i.e., social, environmental, and financial). Considering the numerous negative consequences of construction activities, particularly for the environment, efforts should be taken to minimize the duration of the construction phase and the risk of delays. This study involved empirical research about the causes of delay in the U.S. construction industry. It was based on the findings of a nationwide survey, and targeted experienced experts in the construction industry in order to study the causes of delays in construction projects. The survey results showed that excessive change orders and delay in decision making process played a significant role in causing delays. The factor analysis results indicated that 14 delay causes can be extracted and grouped into four categories namely, communication, decision making process, designer's inefficiency, and contractor' efficiency. These findings could be used to combine together delays causes, so that the root causes of delays could be determined.
引用
收藏
页码:111 / 122
页数:12
相关论文
共 50 条
  • [1] Causes and effects of delays in Malaysian construction industry
    Sambasivan, Murali
    Soon, Yau Wen
    [J]. International Journal of Project Management, 2007, 25 (05) : 517 - 526
  • [2] Assessment of the causes of delays in the UAE construction industry
    Faridi, AS
    El-Sayegh, SM
    [J]. PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 146 - 150
  • [3] Factor Analysis of Inventory Management in Thai Construction Industry
    Jakkraphobyothin, Kanyanat
    Srifa, Suparat
    Chinda, Thanwadee
    [J]. 2018 3RD TECHNOLOGY INNOVATION MANAGEMENT AND ENGINEERING SCIENCE INTERNATIONAL CONFERENCE (TIMES-ICON), 2018,
  • [4] Policy barriers to sustainable construction practice in the Nigerian construction industry: an exploratory factor analysis
    Babalola, Ayotunde
    Harinarain, Nishani
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024, 22 (01) : 214 - 234
  • [5] Delays in construction works in Polish construction industry from the contractors' point of view
    Kowalczyk, Anna
    Meszek, Wieslaw
    Rejment, Mariusz
    Dziadosz, Agnieszka
    [J]. 3RD INTERNATIONAL WORKSHOP ON FLEXIBILITY IN SUSTAINABLE CONSTRUCTION (ORSDCE 2018), 2018, 222
  • [6] The changing input structure of the US construction industry: a longitudinal analysis
    Pietroforte, Roberto
    Gregori, Tullio
    Falagario, Marco
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (11) : 1089 - 1098
  • [7] Perceptions of trust in the US construction industry
    Zuppa, Dino
    Olbina, Svetlana
    Issa, Raymond
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (02) : 211 - 236
  • [8] ISO 9000 and the US construction industry
    Chini, AR
    Valdez, HE
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2003, 19 (02) : 69 - 77
  • [9] The economics of recycling in the US construction industry
    Meyer, Christian
    [J]. SUSTAINABLE CONSTRUCTION MATERIALS AND TECHNOLOGIES, 2007, : 509 - 513
  • [10] Pricing strategy in the US construction industry
    Illinois Inst. of Technology, Dept. of Civil/Architectural Eng., Chicago, IL 60616, United States
    [J]. Construction Management and Economics, 2001, 19 (04) : 405 - 415