Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409

被引:0
|
作者
Nadesparan, Prakash [1 ]
Lahti, Tyler [1 ]
Ferraro, Mary Jane [2 ]
机构
[1] RV Anderson Associates Ltd, Toronto, ON, Canada
[2] Toronto Tunnel Partners, Toronto, ON, Canada
关键词
Transit;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Toronto Tunnel Partners (TTP), under the contract to Metrolinx, recently completed the construction of two 10mtall, 8.5mwide rail tunnels crossing 21 lanes of Highway 401 at the Highway 409 interchange to facilitate the future expansion of the GO transit rail corridor. The tunnels were advanced by use of the Sequential ExcavationMethod (SEM) and required the use of a pre-support pipe canopy to assist with the ground support above the tunnel crowns. A 26 m x 10 m x 9.8 m deep strutted sheet pile shaft was constructed occupying the full median space between Highway 401 and 409 lanes to facilitate auger boring operation necessary to install this pipe canopy. The shaft also aided in the temporary support to the adjacent existing rail tunnel and bridge wing walls that were partially exposed during construction. The shaft also needed to be designed to allow for pipes to be installed through the load resisting sheet pile walls, and later the unbalanced loading during the tunnel construction. At the tunnel portals, a custom thrust frame was required to allow the contractor to complete auger boring up to 4.5 m above grade and was required to resist a 250-tonne thrust load at this height. Retaining walls and work platforms were also required at the portals to facilitate installation of monitoring equipment and temporary support of equipment on the active railway during short duration closures. This paper will provide a comprehensive overview of the design and installation of the unique temporary structures which helped facilitate the construction of this challenging project.
引用
收藏
页码:229 / 238
页数:10
相关论文
共 39 条
  • [1] Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409
    Nadesparan, Prakash
    Lahti, Tyler
    Ferraro, Mary Jane
    PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 4, CSCE 2022, 2024, 367 : 229 - 238
  • [2] Temporary Works Design Innovations for Major Rail Construction Projects
    Garrard, Allan
    Kolber, David
    OKelly, Jack
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION GEOTECHNICS, VOL 3, ICTG 2024, 2025, 404 : 359 - 377
  • [3] The design and construction of temporary works for Limerick Immersed Tube Tunnel
    Smith, A. K. C.
    Thorup, O.
    Hudson, J.
    CHALLENGES AND INNOVATIONS IN GEOTECHNICS: PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1, 2013, : 805 - 808
  • [4] Cardiff Bay Barrage construction planning, temporary works design and construction
    Platt, N
    BARRAGES: ENGINEERING DESIGN & ENVIRONMENTAL IMPACTS, 1996, : 233 - 243
  • [5] Geotechnical aspects of the design and construction of temporary works for support of rail receival pit 3 at DBCT
    Paterson, Sam
    Sundaram, Mogana
    Australian Geomechanics Journal, 2009, 44 (01): : 11 - 18
  • [6] Design and construction of Map Kabao Tunnel, longest rail tunnel in Thailand
    Morya P.
    Chansutham T.
    Phienwej N.
    Chanrungautai S.
    Inkoom P.
    Jongpradit P.
    Geomechanik und Tunnelbau, 2023, 16 (03): : 292 - 303
  • [7] Design and construction of remedial works for the Standedge canal tunnel
    Hallam, J.
    Child, D.R.
    Hindle, D.J.
    Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 2002, 111 A89-158
  • [8] Design and construction of remedial works for the Standedge canal tunnel
    Hallam, J
    Child, DR
    Hindle, DJ
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2002, 111 : A106 - A114
  • [9] The design and construction control for a temporary support system in an immersed tunnel
    Yang, H. (young_1980@126.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (50):
  • [10] Longest Swiss double track rail tunnel under construction
    Bosshard, M
    Matter, J
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 499 - 506