Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409

被引:0
|
作者
Nadesparan, Prakash [1 ]
Lahti, Tyler [1 ]
Ferraro, Mary Jane [2 ]
机构
[1] RV Anderson Associates Ltd, Toronto, ON, Canada
[2] Toronto Tunnel Partners, Toronto, ON, Canada
关键词
Transit;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Toronto Tunnel Partners (TTP), under the contract to Metrolinx, recently completed the construction of two 10mtall, 8.5mwide rail tunnels crossing 21 lanes of Highway 401 at the Highway 409 interchange to facilitate the future expansion of the GO transit rail corridor. The tunnels were advanced by use of the Sequential ExcavationMethod (SEM) and required the use of a pre-support pipe canopy to assist with the ground support above the tunnel crowns. A 26 m x 10 m x 9.8 m deep strutted sheet pile shaft was constructed occupying the full median space between Highway 401 and 409 lanes to facilitate auger boring operation necessary to install this pipe canopy. The shaft also aided in the temporary support to the adjacent existing rail tunnel and bridge wing walls that were partially exposed during construction. The shaft also needed to be designed to allow for pipes to be installed through the load resisting sheet pile walls, and later the unbalanced loading during the tunnel construction. At the tunnel portals, a custom thrust frame was required to allow the contractor to complete auger boring up to 4.5 m above grade and was required to resist a 250-tonne thrust load at this height. Retaining walls and work platforms were also required at the portals to facilitate installation of monitoring equipment and temporary support of equipment on the active railway during short duration closures. This paper will provide a comprehensive overview of the design and installation of the unique temporary structures which helped facilitate the construction of this challenging project.
引用
收藏
页码:229 / 238
页数:10
相关论文
共 39 条
  • [21] Analysis of Vibration Characteristics of New Subway Tunnel Undercrossing the Existing Highway Under Blasting Construction
    Hu, De-hua
    Duan, Jing-chuan
    INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE AND CIVIL ENGINEERING, MSCE 2016, 2016, : 475 - 480
  • [22] Analysis of Vibration Characteristics of New Subway Tunnel Undercrossing the Existing Highway under Blasting Construction
    Hu, Dehua
    Duan, Jingchuan
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (13): : 4781 - 4786
  • [23] Design and construction of sewer tunnels under the deep tunnel sewerage system
    Tan, BT
    Van Weele, B
    TUNNELS AND UNDERGROUND STRUCTURES, 2000, : 235 - 240
  • [24] Proposal on rationalization of experimental design technique under tunnel construction by NATM
    Suzuki, Shoji
    Furukawa, Kohei
    Hieida, Masashi
    Nakagawa, Koji
    Doboku Gakkai Rombun-Hokokushu/Proceedings of the Japan Society of Civil Engineers, 1993, (468 pt 6-19): : 47 - 56
  • [25] Design and construction of a massive tunnel junction for Hong Kong's Express Rail Link Project
    Pollak, S.
    Choi, K.
    Diemont, K.
    Kwok, D.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 2140 - 2147
  • [26] Second tube of the Gotthard Road Tunnel: Tunnel design and challenges after 2 years of construction of the preparatory works
    Carrera, E.
    Ballacchino, G.
    Fries, T.
    Ackermann, T.
    PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 494 - 502
  • [27] DESIGN AND CONSTRUCTION OF A WIDE TUNNEL UNDER SHALLOW COVER - THE LAFAYETTE BLUFF TUNNEL SOUTH PORTAL
    PETERSEN, DL
    NELSON, CR
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1993, 30 (07) : 1477 - 1483
  • [28] Optimum design of multi-anchored larssen type sheet pile wall for temporary construction works
    Yazici, Mehmet F.
    Keskin, Siddika N.
    GEOMECHANICS AND ENGINEERING, 2021, 27 (01) : 1 - 11
  • [29] Design and construction of a water supply tunnel under New York Harbor, USA
    Watson, David
    Lawrence, Colin
    Essex, Randall
    Shultz, Michael
    Larsen, Brian
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2020, 173 (04) : 177 - 186
  • [30] Design and construction of remedial works for the Standedge canal tunnel (vol 111, pg A106, 2002)
    Hallam, J
    Child, DR
    Hindle, DJ
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2002, 111 : A210 - A210