共 41 条
- [1] Temporary Works Design Innovations for Major Rail Construction Projects PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION GEOTECHNICS, VOL 3, ICTG 2024, 2025, 404 : 359 - 377
- [2] Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409 PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 3, CSCE 2022, 2024, 359 : 229 - 238
- [3] Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409 PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 4, CSCE 2022, 2024, 367 : 229 - 238
- [4] Geotechnical aspects on design and construction of stabilization ponds Water Resources Management III, 2005, 80 : 31 - 39
- [5] Geotechnical aspects of landfill design and construction. Part 3: Selected calculation methods for geotechnical landfill design Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 1994, 107 (02): : 115 - 122
- [6] Geotechnical design and construction aspects of the Clarke Quay station TUNNELS AND UNDERGROUND STRUCTURES, 2000, : 405 - 412
- [7] Cardiff Bay Barrage construction planning, temporary works design and construction BARRAGES: ENGINEERING DESIGN & ENVIRONMENTAL IMPACTS, 1996, : 233 - 243
- [8] Geotechnical issues in design and construction of viaducts of the Taiwan high speed rail Proceedings of the Twelfth Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, Vol 1 and 2, 2003, : 1097 - 1107
- [9] Geotechnical design and construction aspects of the Tsing Tsuen tunnels - KCRC West Rail Phase; Contract DB320 GEOTECHNICAL ENGINEERING MEETING SOCIETY'S NEEDS, VOLS 1 AND 2, PROCEEDINGS, 2001, : 443 - 448
- [10] Geotechnical design and construction aspects of the Tsing Tsuen Tunnels - contract DB320 KCRC West Rail Project (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 621 - 627