共 41 条
- [33] Geotechnical design and construction aspects of the M80 bridges across Moonee Ponds Creek in Melbourne Australian Geomechanics Journal, 2014, 49 (02): : 51 - 62
- [34] Design of ground freezing as temporary support during the construction of underground structures of the subway line 'U5' in Berlin GROUND FREEZING 2000: FROST ACTION IN SOILS, 2000, : 295 - 298
- [35] New Champlain Bridge Over the Saint Lawrence River in Montreal. Design of the Temporary Works for the Construction of the Cable-Stayed Bridge HORMIGON Y ACERO, 2022, 73 (297): : 31 - 39
- [36] Construction scheme design for deep foundation pit constructed by top-down method based on 3D FEM Yantu Lixue/Rock and Soil Mechanics, 2008, 29 (05): : 1391 - 1395
- [39] DESIGN + CONSTRUCTION OF MAGNETS + MAGNET SUPPORT STRUCTURE FOR MURA 50-MEV ELECTRON ACCELERATOR. 3 REVIEW OF SCIENTIFIC INSTRUMENTS, 1964, 35 (11): : 1402 - &
- [40] THE CAPABILITIES OF 3D GEOSPATIAL TECHNOLOGIES IN THE DECISION-SUPPORT PROCESS FOR DESIGN, CONSTRUCTION, AND EMPLOYMENT OF ENGINEERING STRUCTURE MEASUREMENT, VISUALISATION AND PROCESSING IN BIM FOR DESIGN AND CONSTRUCTION MANAGEMENT II, 2022, 46-5 (W1): : 217 - 223