Geotechnical aspects of the design and construction of temporary works for support of rail receival pit 3 at DBCT

被引:0
|
作者
Paterson, Sam [1 ,3 ]
Sundaram, Mogana [2 ]
机构
[1] Worley Parsons, Albert St., Brisbane QLD, Australia
[2] Connell Wagner, Spring Hill, Brisbane, QLD, Australia
[3] Connell Hatch, 433 Boundary Street, Spring Hill, 4004 QLD, Australia
来源
Australian Geomechanics Journal | 2009年 / 44卷 / 01期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Excavation
引用
收藏
页码:11 / 18
相关论文
共 41 条
  • [31] Umbrella Arch Nomenclature and Selection Methodology for Temporary Support Systems for the Design and Construction of Tunnels
    Oke, Jeffrey
    Vlachopoulos, Nicholas
    Marinos, Vassilis
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2014, 32 (01) : 97 - 130
  • [32] Optimum design of multi-anchored larssen type sheet pile wall for temporary construction works
    Yazici, Mehmet F.
    Keskin, Siddika N.
    GEOMECHANICS AND ENGINEERING, 2021, 27 (01) : 1 - 11
  • [33] Geotechnical design and construction aspects of the M80 bridges across Moonee Ponds Creek in Melbourne
    Maqbool, S.
    Lee, B.
    Ims, B.
    Australian Geomechanics Journal, 2014, 49 (02): : 51 - 62
  • [34] Design of ground freezing as temporary support during the construction of underground structures of the subway line 'U5' in Berlin
    Hass, H
    Seegers, J
    GROUND FREEZING 2000: FROST ACTION IN SOILS, 2000, : 295 - 298
  • [35] New Champlain Bridge Over the Saint Lawrence River in Montreal. Design of the Temporary Works for the Construction of the Cable-Stayed Bridge
    Peiretti, Hugo Corres
    Caldentey, Alejandro Perez
    Mateos, Javier Milian
    Nunez, Alejandro Abel
    Ballesteros, Antonio Romero
    Serrano, Conchita Lucas
    HORMIGON Y ACERO, 2022, 73 (297): : 31 - 39
  • [36] Construction scheme design for deep foundation pit constructed by top-down method based on 3D FEM
    Rui, Rui
    Xia, Yuan-You
    Yantu Lixue/Rock and Soil Mechanics, 2008, 29 (05): : 1391 - 1395
  • [37] Construction scheme design for deep foundation pit constructed by "top-down" method based on 3D FEM
    Rui Rui
    Xia Yuan-you
    ROCK AND SOIL MECHANICS, 2008, 29 (05) : 1391 - 1395
  • [38] DV3+HED+: a DCNN-based framework to monitor temporary works and ESAs in railway construction project using VHR satellite images
    Guo, Rui
    Liu, Ronghua
    Li, Na
    Liu, Wei
    JOURNAL OF APPLIED REMOTE SENSING, 2020, 14 (01)
  • [39] DESIGN + CONSTRUCTION OF MAGNETS + MAGNET SUPPORT STRUCTURE FOR MURA 50-MEV ELECTRON ACCELERATOR. 3
    HAXBY, RO
    MULADY, JR
    WINTER, WR
    WALLENMEYER, WA
    PRUETT, CH
    DAY, EA
    REVIEW OF SCIENTIFIC INSTRUMENTS, 1964, 35 (11): : 1402 - &
  • [40] THE CAPABILITIES OF 3D GEOSPATIAL TECHNOLOGIES IN THE DECISION-SUPPORT PROCESS FOR DESIGN, CONSTRUCTION, AND EMPLOYMENT OF ENGINEERING STRUCTURE
    Seredovich, V
    Vach, K.
    Shults, R.
    MEASUREMENT, VISUALISATION AND PROCESSING IN BIM FOR DESIGN AND CONSTRUCTION MANAGEMENT II, 2022, 46-5 (W1): : 217 - 223