共 50 条
- [1] Design and construction of remedial works for the Standedge canal tunnel TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2002, 111 : A106 - A114
- [2] Design and construction of remedial works for the Standedge canal tunnel (vol 111, pg A106, 2002) TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2002, 111 : A210 - A210
- [3] Remedial works in the Karavanke tunnel EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, 1998, : 3743 - 3747
- [6] The design and construction of temporary works for Limerick Immersed Tube Tunnel CHALLENGES AND INNOVATIONS IN GEOTECHNICS: PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1, 2013, : 805 - 808
- [7] DESIGN AND CONSTRUCTION OF NEW SPILLWAYS AND OTHER REMEDIAL WORKS TO THE LITTON RESERVOIRS, NEAR BRISTOL. Journal of the Institution of Water Engineers and Scientists, 1986, 40 (01): : 37 - 53
- [8] THE DESIGN AND IMPLEMENTATION OF REMEDIAL WORKS TO COWLEY CUTTING LANDSLIDES, VOLS 1-3, 1988, : 959 - 963
- [9] Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409 PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 4, CSCE 2022, 2024, 367 : 229 - 238
- [10] Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409 PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 3, CSCE 2022, 2024, 359 : 229 - 238