4D BIM and Reality Model-Driven Camera Placement Optimization for Construction Monitoring

被引:2
|
作者
Houng, Seau Chen [1 ]
Pal, Aritra [1 ]
Lin, Jacob J. [1 ]
机构
[1] Natl Taiwan Univ, Dept Civil Engn, 1 Sect 4,Roosevelt Rd, Taipei 10617, Taiwan
关键词
VISION; RECOGNITION;
D O I
10.1061/JCEMD4.COENG-14600
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cameras are one of the most valuable sensors for collecting high-quality visual data on construction sites for uses ranging from surveillance to automated information exaction. The dynamic nature of sites means the visual data from cameras can suffer from occlusions and lack of coverage due to progressing works, hindering the performance of automated visual analysis methods. Therefore, manual planning and adjustments by experienced practitioners are required for appropriate camera placement at the site, which is expensive and time-consuming. Past research has simulated cameras and used algorithms with an objective function to optimize installation parameters with planned site models ranging from two-dimensional (2D) to four-dimensional (4D). However, these models lack information from ongoing site conditions, hampering actual camera performance. This study proposes a camera placement framework incorporating 4D-building information model (BIM) and reality models. The framework first identifies the camera placement determinants through expert interviews. Next, the planned BIM and reality models are used to construct the simulation environment, and camera placement parameters are optimized. The proposed framework is implemented and evaluated on a construction site. 25% average camera coverage improvement from the benchmark solution is achieved. This study further contributes to the potential application of automated visual monitoring systems on construction sites.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Data-driven 4D Visualization for Simulating Highway Construction Processes
    Chen Guojun
    Liu Yan
    Chen Jingxiang
    Wu Wei
    [J]. 2012 ACM/IEEE/SCS 26TH WORKSHOP ON PRINCIPLES OF ADVANCED AND DISTRIBUTED SIMULATION (PADS), 2012, : 196 - 198
  • [42] Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs
    Han, Kevin K.
    Golparvar-Fard, Mani
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 53 : 44 - 57
  • [43] Bridge construction progress monitoring using lidar and 4D design models
    Puri, Nisha
    Turkan, Yelda
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 109
  • [44] 4D BIM Simulation Guideline for Construction Visualization and Analysis of Renovation Projects: A Case Study
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Parajuli, Aakash
    Mehra, Mayuri
    [J]. FRONTIERS IN BUILT ENVIRONMENT, 2021, 7
  • [45] 4D BIM integrated construction supply chain logistics to optimise on-site production
    Magill, Leslie J.
    Jafarifar, Naeimeh
    Watson, Alan
    Omotayo, Temitope
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2325 - 2334
  • [46] Information Modeling for 4D BIM-Based Construction Robot Task Planning and Simulation
    Oyedira, Hafiz
    Turner, William
    Kim, Kyungki
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: ADVANCED TECHNOLOGIES, AUTOMATION, AND COMPUTER APPLICATIONS IN CONSTRUCTION, 2024, : 816 - 825
  • [47] Framework of Dynamic Daily 4D BIM for Tracking Construction Progress through a Web Environment
    Park, Jaehyun
    Cai, Hubo
    [J]. COMPUTING IN CIVIL ENGINEERING 2017: INFORMATION MODELLING AND DATA ANALYTICS, 2017, : 193 - 201
  • [48] Research on Application of Construction Model Based on 4D Visualization in Construction of Intelligent Substation
    Ren, Chunguang
    Wang, Yachen
    Xue, Kai
    Zhi, Shenglong
    Chen, Tao
    [J]. 2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632
  • [49] Integrated 4D Design Change Management Model for Construction Projects
    Wang, Liannian
    Lee, Joomyung
    Nimawat, Jatin
    Han, Kevin
    Gupta, Abhinav
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [50] Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector
    Assafi, Mohammad Nafe
    Hossain, Md Mehrab
    Chileshe, Nicholas
    Datta, Shuvo Dip
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (05): : 1255 - 1278