共 50 条
- [1] Monitoring Construction Progress Based on 4D BIM Technology [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
- [2] 4D BIM model adaptation based on construction progress monitoring [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 337 - 344
- [7] Dynamic construction material layout planning optimization model by integrating 4D BIM [J]. Engineering with Computers, 2019, 35 : 703 - 720
- [10] 4D BIM for Construction Planning and Environmental Planning [J]. INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110