4D BIM model adaptation based on construction progress monitoring

被引:0
|
作者
Sigalov, K. [1 ]
Koenig, M. [1 ]
机构
[1] Ruhr Univ Bochum, Chair Comp Engn, Bochum, Germany
关键词
BUILDING INFORMATION; RECOGNITION; WORKERS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction process is usually characterized by delays, deviations and rescheduling. An efficient control of the construction process requires a timely and continuous detection of the construction status and possible deviations. Subsequently, the construction progress should be analyzed quickly and in detail. As a result, responses to emerging issues and rescheduling can be performed timely. Currently, such adaptation is a mostly manual procedure, which is labor-intensive and time-consuming. This contribution examines the possibility of an intelligent adaptation of 4D models for construction scheduling by using pattern recognition methods. The primary focus is on the reducing of manual intervention and improving of progress monitoring.
引用
收藏
页码:337 / 344
页数:8
相关论文
共 50 条
  • [1] Monitoring Construction Progress Based on 4D BIM Technology
    Chen, Jingjing
    Wu, Juan
    Qu, Yan
    [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [2] Construction Progress Monitoring through the Integration of 4D BIM and SLAM-Based Mapping Devices
    Vassena, Giorgio P. M.
    Perfetti, Luca
    Comai, Sara
    Ventura, Silvia Mastrolembo
    Ciribini, Angelo L. C.
    [J]. BUILDINGS, 2023, 13 (10)
  • [3] 4D model based automated construction activity monitoring
    Rebolj, D.
    Podbreznik, P.
    Babic, N. C.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTIO N, 2009, : 553 - 556
  • [4] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM
    Sebastian Tuttas
    Alexander Braun
    André Borrmann
    Uwe Stilla
    [J]. PFG – Journal of Photogrammetry, Remote Sensing and Geoinformation Science, 2017, 85 : 3 - 15
  • [5] Acquisition and Consecutive Registration of Photogrammetric Point Clouds for Construction Progress Monitoring Using a 4D BIM
    Tuttas, Sebastian
    Braun, Alexander
    Borrmann, Andre
    Stilla, Uwe
    [J]. PFG-JOURNAL OF PHOTOGRAMMETRY REMOTE SENSING AND GEOINFORMATION SCIENCE, 2017, 85 (01): : 3 - 15
  • [6] 4D CAD model updating using image processing-based construction progress monitoring
    Kim, Changyoon
    Kim, Byoungil
    Kim, Hyoungkwan
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 35 : 44 - 52
  • [7] 4D BIM and Reality Model-Driven Camera Placement Optimization for Construction Monitoring
    Houng, Seau Chen
    Pal, Aritra
    Lin, Jacob J.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (06)
  • [8] Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs
    Han, Kevin K.
    Golparvar-Fard, Mani
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 53 : 44 - 57
  • [9] 4D BIM for Construction Logistics Management
    Whitlock, Kane
    Abanda, Fonbeyin Henry
    Manjia, Marcelline Blanche
    Pettang, Chrispin
    Nkeng, George Elambo
    [J]. CIVILENG, 2021, 2 (02): : 325 - 348
  • [10] Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs
    Golparvar-Fard, Mani
    Pena-Mora, Feniosky
    Arboleda, Carlos A.
    Lee, SangHyun
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2009, 23 (06) : 391 - 404