共 50 条
- [1] 4D BIM model adaptation based on construction progress monitoring [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 337 - 344
- [3] Monitoring Construction Progress Based on 4D BIM Technology [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
- [4] Dynamic construction material layout planning optimization model by integrating 4D BIM [J]. Engineering with Computers, 2019, 35 : 703 - 720
- [6] 4D BIM Based Optimal Flight Planning for Construction Monitoring Applications Using Camera-Equipped UAVs [J]. COMPUTING IN CIVIL ENGINEERING 2019: DATA, SENSING, AND ANALYTICS, 2019, : 217 - 224
- [10] 4D model based automated construction activity monitoring [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTIO N, 2009, : 553 - 556