BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule

被引:12
|
作者
Chen, Xinyang [1 ,2 ]
Zhu, Yifan [2 ,3 ]
Chen, Hainan [4 ]
Ouyang, Yewei [2 ,3 ]
Luo, Xiaowei [2 ,3 ]
Wu, Xiaoling [1 ]
机构
[1] Guangdong Univ Technol, Guangzhou, Peoples R China
[2] City Univ Hong Kong, Shenzhen Res Inst, Shenzhen, Peoples R China
[3] City Univ Hong Kong, Dept Architecture & Civil Engn, Hong Kong, Peoples R China
[4] Sun Yat Sen Univ, Sch Intelligent Syst Engn, Shenzhen, Peoples R China
基金
美国国家科学基金会; 中国博士后科学基金;
关键词
Camera placement; Construction schedule; Modified parallel genetic algorithm; Building Information Modelling (BIM); SURVEILLANCE; IDENTIFICATION;
D O I
10.1016/j.autcon.2021.103825
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction cameras have been used to support autonomous job site monitoring in recent years. However, it remains challenging to find the optimal camera placement configuration in a dynamic job site environment. To address this problem, this paper proposes a camera placement optimization framework using building information modeling (BIM). The framework considers changes in dynamic obstacles and working areas in different construction stages. Data image is used as the data mediator to connect the three modules (BIM module, mathematical module, and optimization module), visualizing the site discrete and optimized result. The efficiency of the framework is validated through the test of an indoor construction project with a size of 2000 square meters. Compared to the experience-based camera placement configuration, the optimal camera placement calculated by the proposed framework achieves 12% improvement in total coverage.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] BIM-based ventilation shaft construction schedule simulation and plan optimization
    Shen, Jiao
    Wu, Qing
    Peng, Chen
    Zhao, Suya
    [J]. 2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634
  • [2] BIM-based Collaborative Schedule Management System for the Construction Industry
    Hou, Xue-liang
    Lin, Zhi-ming
    [J]. 2016 INTERNATIONAL CONFERENCE ON MANAGEMENT, ECONOMICS AND SOCIAL DEVELOPMENT (ICMESD 2016), 2016, : 957 - 962
  • [3] Study on BIM-based construction project cost and schedule risk early warning
    Sun, Chengshuang
    Man, Qingpeng
    Wang, Yaowu
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (02) : 469 - 477
  • [4] 4D BIM and Reality Model-Driven Camera Placement Optimization for Construction Monitoring
    Houng, Seau Chen
    Pal, Aritra
    Lin, Jacob J.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (06)
  • [5] BIM-based architectural analysis and optimization for construction 4.0 concept (a comparison)
    Zhang, Jie
    Zhu, Xuping
    Khan, Abdul Mateen
    Houda, Moustafa
    Rehman, Sardar Kashif Ur
    Jameel, Mohammed
    Javed, Muhammad Faisal
    Alrowais, Raid
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (06)
  • [6] Approaches for BIM-based multi-objective optimization in construction scheduling
    Essam, Noha
    Khodeir, Laila
    Fathy, Fatma
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (06)
  • [7] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 119
  • [8] A BIM-based Construction Workflow Management Approach
    Yao, Qiyan
    Lu, Yang
    Feng, Yuqiang
    [J]. PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 456 - 460
  • [9] BIM-based indoor mobile robot initialization for construction automation using object detection
    Zhao, Xinge
    Cheah, Chien Chern
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 146
  • [10] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    [J]. Automation in Construction, 2020, 119