BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule

被引:16
|
作者
Chen, Xinyang [1 ,2 ]
Zhu, Yifan [2 ,3 ]
Chen, Hainan [4 ]
Ouyang, Yewei [2 ,3 ]
Luo, Xiaowei [2 ,3 ]
Wu, Xiaoling [1 ]
机构
[1] Guangdong Univ Technol, Guangzhou, Peoples R China
[2] City Univ Hong Kong, Shenzhen Res Inst, Shenzhen, Peoples R China
[3] City Univ Hong Kong, Dept Architecture & Civil Engn, Hong Kong, Peoples R China
[4] Sun Yat Sen Univ, Sch Intelligent Syst Engn, Shenzhen, Peoples R China
基金
中国博士后科学基金; 美国国家科学基金会;
关键词
Camera placement; Construction schedule; Modified parallel genetic algorithm; Building Information Modelling (BIM); SURVEILLANCE; IDENTIFICATION;
D O I
10.1016/j.autcon.2021.103825
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction cameras have been used to support autonomous job site monitoring in recent years. However, it remains challenging to find the optimal camera placement configuration in a dynamic job site environment. To address this problem, this paper proposes a camera placement optimization framework using building information modeling (BIM). The framework considers changes in dynamic obstacles and working areas in different construction stages. Data image is used as the data mediator to connect the three modules (BIM module, mathematical module, and optimization module), visualizing the site discrete and optimized result. The efficiency of the framework is validated through the test of an indoor construction project with a size of 2000 square meters. Compared to the experience-based camera placement configuration, the optimal camera placement calculated by the proposed framework achieves 12% improvement in total coverage.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] A BIM-based construction supply chain framework for monitoring progress and coordination of site activities
    Getuli, Vito
    Ventura, Silvia Mastrolembo
    Capone, Pietro
    Ciribini, Angelo L. C.
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 542 - 549
  • [32] Towards automated construction progress monitoring using BIM-based point cloud processing
    Braun, A.
    Borrmann, A.
    Tuttas, S.
    Stilla, U.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION 2014, 2015, : 101 - 107
  • [33] BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps
    Moon, Hyounseok
    Kim, Hyeonseung
    Kamat, Vineet R.
    Kang, Leenseok
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2015, 29 (03)
  • [34] BIM-based detection and optimization of spatial-temporal clashes in underground pipeline construction
    Yin, Jun
    Luo, Sang
    Rui, Jianqiu
    Yao, Jinyue
    Zhang, Fang
    Fu, Boyang
    Kassem, Mohamad
    AUTOMATION IN CONSTRUCTION, 2024, 166
  • [35] Optimization of Tunnel Construction Schedule Considering Soft Logic
    Wei, Jianying
    Liu, Yuming
    Lu, Xiaochun
    Feng, Yu
    Wang, Yadi
    APPLIED SCIENCES-BASEL, 2024, 14 (06):
  • [36] Automatic Indoor Construction Process Monitoring for Tiles Based on BIM and Computer Vision
    Deng, Hui
    Hong, Hao
    Luo, Dehuan
    Deng, Yichuan
    Su, Cheng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (01)
  • [37] A BIM-based construction quality management model and its applications
    Chen, LiJuan
    Luo, Hanbin
    AUTOMATION IN CONSTRUCTION, 2014, 46 : 64 - 73
  • [38] Contractual challenges for BIM-based construction projects: a systematic review
    Abd Jamil, Ahmad Huzaimi
    Fathi, Mohamad Syazli
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2018, 8 (04) : 372 - 385
  • [39] Scientometric analysis of BIM-based research in construction engineering and management
    Jin, Ruoyu
    Zou, Yang
    Gidado, Kassim
    Ashton, Phillip
    Painting, Noel
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (08) : 1750 - 1776
  • [40] An integrated BIM-based approach for cost estimation in construction projects
    Fazeli, Abdulwahed
    Dashti, Mohammad Saleh
    Jalaei, Farzad
    Khanzadi, Mostafa
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2828 - 2854