Integrated 4D Design Change Management Model for Construction Projects

被引:1
|
作者
Wang, Liannian [1 ]
Lee, Joomyung [2 ]
Nimawat, Jatin [1 ]
Han, Kevin [1 ]
Gupta, Abhinav [1 ]
机构
[1] North Carolina State Univ, Dept Civil Construct & Environm Engn, Raleigh, NC 27695 USA
[2] North Carolina State Univ, Ctr Nucl Energy Facil & Struct, Raleigh, NC 27695 USA
关键词
INFORMATION MODEL;
D O I
10.1061/JCEMD4.COENG-14246
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Managing design changes effectively can reduce cost overruns and schedule delays in construction projects. However, existing design change management in construction projects lacks integration with schedules, comprehensive design change information, and interoperability with other applications. This study aims to address the aforementioned limitations by presenting an integrated four-dimensional (4D) design change management model (DCMM). We developed this model by integrating design changes with 4D building information modeling (BIM) models, extracting informative data from model geometry and design files to provide essential information for design change impact analysis and management, interfacing with a data warehouse for efficient data management, and utilizing interoperable data schemas for cross-platform compatibility. The integrated 4D DCMM successfully validated its abilities through two case studies, despite certain limitations such as only focusing on tracking main structural building elements. Our study introduces significant contributions to the field of design change management in construction projects by (1) allowing design changes tracking along construction progress, thus enhancing project controls and facilitating effective communication among project teams, (2) providing comprehensive information for design change management and assessing structural integrity risks resulting from design changes, thereby improving inspection practices in construction projects, and (3) enabling universal interoperability of design change management files across various BIM applications, enhancing construction data asset management.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] An integrated safety management with construction management using 4D CAD model
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    [J]. SAFETY SCIENCE, 2010, 48 (03) : 395 - 403
  • [2] Application of 4D for dynamic site layout and management of construction projects
    Ma, ZY
    Shen, QP
    Zhang, JP
    [J]. AUTOMATION IN CONSTRUCTION, 2005, 14 (03) : 369 - 381
  • [3] 4D visualization of highway construction projects
    Liapi, KA
    [J]. SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION VISUALIZATION, PROCEEDINGS, 2003, : 639 - 644
  • [4] An evaluation of the applicability of 4D CAD on construction projects
    Mahalingam, Ashwin
    Kashyap, Rahul
    Mahajan, Charudatta
    [J]. AUTOMATION IN CONSTRUCTION, 2010, 19 (02) : 148 - 159
  • [5] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    [J]. 2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [6] Quality and change management model for large scale concurrent design and construction projects
    Lee, S
    Peña-Mora, F
    Park, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (08) : 890 - 902
  • [7] Construction management pull for 4D CAD
    Barrett, P
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 977 - 983
  • [8] 4D BIM for Construction Logistics Management
    Whitlock, Kane
    Abanda, Fonbeyin Henry
    Manjia, Marcelline Blanche
    Pettang, Chrispin
    Nkeng, George Elambo
    [J]. CIVILENG, 2021, 2 (02): : 325 - 348
  • [9] 4D Applications of GIS in Construction Management
    Kumar, A. Chaitanya
    Reshma, T.
    [J]. ADVANCES IN CIVIL ENGINEERING, 2017, 2017
  • [10] Integrated knowledge management model and system for construction projects
    Kanapeckiene, L.
    Kaklauskas, A.
    Zavadskas, E. K.
    Seniut, M.
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2010, 23 (07) : 1200 - 1215