INTEGRATIVE CYCLE SCHEDULING APPROACH FOR A CAPACITATED FLEXIBLE ASSEMBLY SYSTEM

被引:7
|
作者
KIM, D
MABERT, VA
PINTO, PA
机构
[1] INDIANA UNIV,GRAD SCH BUSINESS,DEPT OPERAT MANAGEMENT,BLOOMINGTON,IN 47405
[2] BOWLING GREEN STATE UNIV,COLL BUSINESS ADM,DEPT MANAGEMENT,BOWLING GREEN,OH 43403
关键词
D O I
10.1111/j.1540-5915.1993.tb00466.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study revisits the traditional single stage, multi-item, capacitated lot-sizing problem (CLSP) with a new integrative focus on problem structuring. Unlike past research, we develop integrative cycle scheduling approaches which simultaneously address lot-sizing, capacity, and sequencing issues. Our purposes are to (1) explore the effect of sequencing on inventory levels, (2) examine the problem of infeasibility in the economic lot scheduling problem (ELSP), and (3) provide a simple methodology of generating low-cost cycle schedules in an environment with discrete shipping, dynamic demands, limited capacity, zero setup cost, and sequence-independent setup times. Our procedures are compared to benchmark cycle scheduling approaches in terms of both inventory cost and computation time under different demand scenarios, using the operating data from a flexible assembly system (FAS) at the Ford Motor Company's Sandusky, Ohio plant.
引用
收藏
页码:126 / 147
页数:22
相关论文
共 50 条
  • [41] Scheduling Flexible Assembly Systems with Taboo Search Algorithm
    Zhao Liang-hui
    Wang Sheng-fa
    ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 172 - +
  • [42] FLEXIBLE ASSEMBLY SYSTEMS - THE SCHEDULING PROBLEM FOR MULTIPLE PRODUCTS
    DONATH, M
    GRAVES, RJ
    CARLSON, DA
    JOURNAL OF MANUFACTURING SYSTEMS, 1989, 8 (01) : 27 - 34
  • [43] TASK ASSIGNMENT AND SUBASSEMBLY SCHEDULING IN FLEXIBLE ASSEMBLY LINES
    AGNETIS, A
    NICOLO, F
    ARBIB, C
    LUCERTINI, M
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1995, 11 (01): : 1 - 20
  • [44] A gain scheduling approach for a flexible aircraft
    Aouf, N
    Boulet, B
    Botez, R
    PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 4439 - 4442
  • [45] A scheduling approach to assembly sequence planning
    Del Valle, C
    Toro, M
    Camacho, EF
    Gasca, RM
    PROCEEDINGS OF THE 2003 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2003), 2003, : 103 - 108
  • [46] SIMULATION OF A FLEXIBLE ASSEMBLY SYSTEM
    SCHEIFELE, M
    WARSCHAT, J
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1984, 74 (06): : 337 - 340
  • [47] The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery
    Yang, Shengluo
    Xu, Zhigang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (13) : 4053 - 4071
  • [48] Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem
    Jeong, BJ
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 777 - 780
  • [49] Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem
    Jeong, B.J.
    Computers and Industrial Engineering, 1997, 33 (3-4): : 777 - 780
  • [50] An evolutionary approach to complex job-shop and flexible manufacturing system scheduling
    Rossi, A
    Dini, G
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2001, 215 (02) : 233 - 245