INTEGRATIVE CYCLE SCHEDULING APPROACH FOR A CAPACITATED FLEXIBLE ASSEMBLY SYSTEM

被引:7
|
作者
KIM, D
MABERT, VA
PINTO, PA
机构
[1] INDIANA UNIV,GRAD SCH BUSINESS,DEPT OPERAT MANAGEMENT,BLOOMINGTON,IN 47405
[2] BOWLING GREEN STATE UNIV,COLL BUSINESS ADM,DEPT MANAGEMENT,BOWLING GREEN,OH 43403
关键词
D O I
10.1111/j.1540-5915.1993.tb00466.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study revisits the traditional single stage, multi-item, capacitated lot-sizing problem (CLSP) with a new integrative focus on problem structuring. Unlike past research, we develop integrative cycle scheduling approaches which simultaneously address lot-sizing, capacity, and sequencing issues. Our purposes are to (1) explore the effect of sequencing on inventory levels, (2) examine the problem of infeasibility in the economic lot scheduling problem (ELSP), and (3) provide a simple methodology of generating low-cost cycle schedules in an environment with discrete shipping, dynamic demands, limited capacity, zero setup cost, and sequence-independent setup times. Our procedures are compared to benchmark cycle scheduling approaches in terms of both inventory cost and computation time under different demand scenarios, using the operating data from a flexible assembly system (FAS) at the Ford Motor Company's Sandusky, Ohio plant.
引用
收藏
页码:126 / 147
页数:22
相关论文
共 50 条
  • [21] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Bongju Jeong
    Seung-Bae Sim
    Hosang Jung
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1033 - 1040
  • [22] PROGRAMMING, SCHEDULING, AND CONTROL OF FLEXIBLE ASSEMBLY SYSTEMS
    VALCKENAERS, P
    VANBRUSSEL, H
    BONGAERTS, L
    BONNEVILLE, F
    COMPUTERS IN INDUSTRY, 1995, 26 (03) : 209 - 218
  • [23] A FLEXIBLE ASSEMBLY SYSTEM
    SCHRODER, M
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1981, 71 (01): : 33 - 38
  • [24] A restless bandit approach for capacitated condition based maintenance scheduling
    Demirci, Ece Zeliha
    Arts, Joachim
    van Houtum, Geert-Jan
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, : 179 - 207
  • [25] Distributed multi-agent scheduling and control system for robotic flexible assembly cells
    Abderraouf Maoudj
    Brahim Bouzouia
    Abdelfetah Hentout
    Ahmed Kouider
    Redouane Toumi
    Journal of Intelligent Manufacturing, 2019, 30 : 1629 - 1644
  • [26] Distributed multi-agent scheduling and control system for robotic flexible assembly cells
    Maoudj, Abderraouf
    Bouzouia, Brahim
    Hentout, Abdelfetah
    Kouider, Ahmed
    Toumi, Redouane
    JOURNAL OF INTELLIGENT MANUFACTURING, 2019, 30 (04) : 1629 - 1644
  • [27] Dynamic Scheduling for a Flexible Manufacturing System - The Pre-emptive Approach
    F.T.S. Chan
    H.K. Chan
    The International Journal of Advanced Manufacturing Technology, 2001, 17 : 760 - 768
  • [28] A SIMULATION STUDY OF FLEXIBLE MANUFACTURING SYSTEM USING DYNAMIC SCHEDULING APPROACH
    Mahalingam, Vijay Kumar
    PROCEEDINGS OF THE ASME 12TH BIENNIAL CONFERENCE ON ENGINEERING SYSTEMS DESIGN AND ANALYSIS - 2014, VOL 1, 2014,
  • [29] Dynamic scheduling for a flexible manufacturing system - The pre-emptive approach
    Chan, FTS
    Chan, HK
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2001, 17 (10): : 760 - 768
  • [30] AN AGENT-BASED APPROACH TO DYNAMIC SCHEDULING AND CONTROL FOR A FLEXIBLE SYSTEM
    Barenji, Ali Vatankhah
    Li, Zhi
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2019, 26 (03): : 251 - 263