INVESTING THE ALASKAN PROJECT CASH FLOWS - THE SOHIO EXPERIENCE

被引:2
|
作者
COOPER, K [1 ]
RICHARDS, RM [1 ]
机构
[1] TEXAS A&M UNIV,COLL BUSINESS ADM,COLLEGE STN,TX 77843
关键词
D O I
10.2307/3665526
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
引用
收藏
页码:58 / 70
页数:13
相关论文
共 50 条
  • [31] Capital Project Analysis When Cash Flows Evolve as a Continuous Time Branching Process
    Davidson, Ian
    Shinozawa, Yoshikatsu
    Tippett, Mark
    [J]. ABACUS-A JOURNAL OF ACCOUNTING FINANCE AND BUSINESS STUDIES, 2009, 45 (01): : 44 - 65
  • [32] Maximizing the net present value of a project with linear time-dependent cash flows
    Vanhoucke, M
    Demeulemeester, E
    Herroelen, W
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) : 3159 - 3181
  • [33] Project network models with discounted cash flows a guided tour through recent developments
    Herroelen, WS
    VanDommelen, P
    Demeulemeester, EL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) : 97 - 121
  • [34] Project network models with discounted cash flows a guided tour through recent developments
    Katholieke Universiteit Leuven, Leuven, Belgium
    [J]. Eur J Oper Res, 1 (97-121):
  • [35] A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
    Thiruvady, Dhananjay
    Wallace, Mark
    Gu, Hanyu
    Schutt, Andreas
    [J]. JOURNAL OF HEURISTICS, 2014, 20 (06) : 643 - 676
  • [36] Multi-operator immune genetic algorithm for project scheduling with discounted cash flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2022, 195
  • [37] An Immune Genetic Algorithm for Resource Constrained Project Scheduling Problem with Discounted Cash Flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon Kumar
    Ryan, Michael J.
    [J]. 2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1179 - 1183
  • [38] Genetic Algorithm for a Discrete-Continuous Project Scheduling Problem with Discounted Cash Flows
    Waligora, Grzegorz
    [J]. 2015 20TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2015, : 52 - 57
  • [39] A branch and bound procedure for the resource constrained project scheduling problem with discounted cash flows
    Icmeli, O
    Erenguc, SS
    [J]. MANAGEMENT SCIENCE, 1996, 42 (10) : 1395 - 1408
  • [40] A resource constrained project scheduling problem with discounted cash flows: A genetic algorithm approach
    Tasan, Seren Ozmehmet
    Gen, Mitsuo
    [J]. PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 632 - 638