Project network models with discounted cash flows a guided tour through recent developments

被引:130
|
作者
Herroelen, WS
VanDommelen, P
Demeulemeester, EL
机构
[1] Katholieke Universiteit Leuven, Department of Applied Economics, B-3000 Leuven
基金
美国国家科学基金会;
关键词
D O I
10.1016/S0377-2217(96)00112-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The vast majority of the project scheduling methodologies presented in the literature have been developed with the objective of minimizing the project duration subject to precedence and other constraints. In doing so, the financial aspects of project management are largely ignored. Recent efforts have taken into account discounted cash flows and have focused on the maximization of the net present value (npv) of the project as the more appropriate objective, In this paper we offer a guided tour through the important recent developments in the expanding field of research on deterministic and stochastic project network models with discounted cash flows. Subsequent to a close examination of the rationale behind the npv objective, we offer a taxonomy of the problems studied in the literature and critically review the major contributions, Proper attention is given to npv maximization models for the unconstrained scheduling problem with known cash flows, optimal and suboptimal scheduling procedures with various types of resource constraints, and the problem of determining both the timing and amount of payments. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:97 / 121
页数:25
相关论文
共 47 条