Heuristics for project scheduling with discounted cash flows optimisation

被引:5
|
作者
Klimek, M. [1 ]
Lebkowski, P. [2 ]
机构
[1] Pope John Paul II State Sch Higher Educ, Dept Comp Sci, PL-21500 Biala Podlaska, Poland
[2] AGH Univ Sci & Technol, Dept Operat Res & Informat Technol, PL-30067 Krakow, Poland
关键词
resource-constrained project scheduling; discounted cash flows; milestones; NET PRESENT VALUE; RESOURCE-ALLOCATION; TABU SEARCH; ALGORITHM; MODELS;
D O I
10.1515/bpasts-2015-0072
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The article presents the resource-constrained project scheduling problem with the maximisation of discounted cash flows from the contractor's perspective: with cash outflows related to starting individual activities and with cash inflows for completing project stages (milestones). The authors propose algorithms for improving a forward active schedule by iterative one-unit right shifts of activities, taking into account different resource flow networks. To illustrate the algorithms and problem, a numerical example is presented. Finally, the algorithms are tested using standard test problems with additionally defined cash flows and contractual milestones.
引用
收藏
页码:613 / 622
页数:10
相关论文
共 50 条
  • [1] FUZZY PROJECT SCHEDULING WITH DISCOUNTED CASH FLOWS
    Shavandi, Hassan
    Najafi, Amir Abbas
    Moslehirad, Alireza
    [J]. ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2012, 46 (01): : 219 - 232
  • [2] Project scheduling with discounted cash flows and progress payments
    Kazaz, B
    Sepil, C
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (10) : 1262 - 1272
  • [3] Project scheduling with discounted cash flows and general. temporal constraints
    Zimmermann, J
    [J]. OPERATIONS RESEARCH PROCEEDINGS 1999, 2000, : 419 - 424
  • [4] Resource constrained project scheduling and material ordering problem with discounted cash flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [5] A new scheduling technique for the resource-constrained project scheduling problem with discounted cash flows
    Leyman, Pieter
    Vanhoucke, Mario
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2771 - 2786
  • [6] A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
    Dhananjay Thiruvady
    Mark Wallace
    Hanyu Gu
    Andreas Schutt
    [J]. Journal of Heuristics, 2014, 20 : 643 - 676
  • [7] Optimizing Discounted Cash Flows in Project Scheduling-An Ant Colony Optimization Approach
    Chen, Wei-Neng
    Zhang, Jun
    Chung, Henry Shu-Hung
    Huang, Rui-Zhang
    Liu, Ou
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2010, 40 (01): : 64 - 77
  • [8] Discrete-continuous project scheduling with discounted cash flows -: A tabu search approach
    Waligora, Grzegorz
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (07) : 2141 - 2153
  • [9] A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
    Thiruvady, Dhananjay
    Wallace, Mark
    Gu, Hanyu
    Schutt, Andreas
    [J]. JOURNAL OF HEURISTICS, 2014, 20 (06) : 643 - 676
  • [10] Multi-operator immune genetic algorithm for project scheduling with discounted cash flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2022, 195