Project scheduling with discounted cash flows and progress payments

被引:27
|
作者
Kazaz, B [1 ]
Sepil, C [1 ]
机构
[1] MIDDLE E TECH UNIV,TR-06531 ANKARA,TURKEY
关键词
project scheduling; mixed integer programming; Benders decomposition;
D O I
10.1057/jors.1996.153
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In all large scale projects, there correspond cash hows that incur throughout the life of the project, The scheduling of these projects to maximize the present value of the cash flows has been a topic of recent research. The basic assumption of earlier research is that the cash flows are mainly associated with some events of the project and they occur at the event realization times. However, in several real life projects, the cash inflows do not occur at the event realization times, rather they occur at the end of some time periods, like months, as progress payments. In this article, maximizing the present value of the cash hows in such projects is considered and a mixed-integer formulation of the problem is presented, In this formulation, activity profit curves are defined and used Computational experience on some randomly generated test problems provides promising results especially when the Benders Decomposition technique is employed for solving the problem.
引用
收藏
页码:1262 / 1272
页数:11
相关论文
共 50 条
  • [1] FUZZY PROJECT SCHEDULING WITH DISCOUNTED CASH FLOWS
    Shavandi, Hassan
    Najafi, Amir Abbas
    Moslehirad, Alireza
    [J]. ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2012, 46 (01): : 219 - 232
  • [2] Heuristics for project scheduling with discounted cash flows optimisation
    Klimek, M.
    Lebkowski, P.
    [J]. BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2015, 63 (03) : 613 - 622
  • [3] Project scheduling with discounted cash flows and general. temporal constraints
    Zimmermann, J
    [J]. OPERATIONS RESEARCH PROCEEDINGS 1999, 2000, : 419 - 424
  • [4] Resource constrained project scheduling and material ordering problem with discounted cash flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [5] A new scheduling technique for the resource-constrained project scheduling problem with discounted cash flows
    Leyman, Pieter
    Vanhoucke, Mario
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2771 - 2786
  • [6] A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
    Dhananjay Thiruvady
    Mark Wallace
    Hanyu Gu
    Andreas Schutt
    [J]. Journal of Heuristics, 2014, 20 : 643 - 676
  • [7] Optimizing Discounted Cash Flows in Project Scheduling-An Ant Colony Optimization Approach
    Chen, Wei-Neng
    Zhang, Jun
    Chung, Henry Shu-Hung
    Huang, Rui-Zhang
    Liu, Ou
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2010, 40 (01): : 64 - 77
  • [8] Discrete-continuous project scheduling with discounted cash flows -: A tabu search approach
    Waligora, Grzegorz
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (07) : 2141 - 2153
  • [9] A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
    Thiruvady, Dhananjay
    Wallace, Mark
    Gu, Hanyu
    Schutt, Andreas
    [J]. JOURNAL OF HEURISTICS, 2014, 20 (06) : 643 - 676
  • [10] Multi-operator immune genetic algorithm for project scheduling with discounted cash flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2022, 195