摘要
Management of projects is complicated by the scarcity of resources required to execute them. Limited resources usually extend the project completion times beyond those determined by CPM/PERT. Several solution procedures have been developed for solving the resource constrained project scheduling problem. One objective commonly used for these problems is to complete the project as early as possible (minimize makespan). The problem considered in this paper is a resource constrained project scheduling problem, with the added features that there are cash flows associated with the project activities, and the objective is to schedule the project activities in such a way that the net present value of cash flows is maximized. With these features the problem becomes financially motivated and more realistic. We introduce a branch and bound procedure to solve the resource constrained project scheduling problem with discounted cash flows. Our procedure exploits the known fact that potential resource violations can be eliminated by introducing additional precedence relations between certain project activities. Specifically, we use the ''minimal delaying alternatives'' concept to resolve resource conflicts. The bounds in the branch and bound procedure are computed by solving Payment Scheduling Problems, which can be formulated as linear programs and by that are well-solvable. We test our procedure computationally on a set of 90 test problems from the literature and compare it with the only other exact procedure we know of.
引用
收藏
页码:1395 / 1408
页数:14
相关论文
共 50 条
  • [1] A TABU SEARCH PROCEDURE FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS
    ICMELI, O
    ERENGUC, SS
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (08) : 841 - 853
  • [2] Resource constrained project scheduling and material ordering problem with discounted cash flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [3] A new scheduling technique for the resource-constrained project scheduling problem with discounted cash flows
    Leyman, Pieter
    Vanhoucke, Mario
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2771 - 2786
  • [4] An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
    DeReyck, B
    Herroelen, W
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (01) : 1 - 17
  • [5] An Immune Genetic Algorithm for Resource Constrained Project Scheduling Problem with Discounted Cash Flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon Kumar
    Ryan, Michael J.
    [J]. 2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1179 - 1183
  • [6] A resource constrained project scheduling problem with discounted cash flows: A genetic algorithm approach
    Tasan, Seren Ozmehmet
    Gen, Mitsuo
    [J]. PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 632 - 638
  • [7] A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    DEMEULEMEESTER, E
    HERROELEN, W
    [J]. MANAGEMENT SCIENCE, 1992, 38 (12) : 1803 - 1818
  • [8] A branch-and-bound procedure for the generalized resource-constrained project scheduling problem
    Demeulemeester, EL
    Herroelen, WS
    [J]. OPERATIONS RESEARCH, 1997, 45 (02) : 201 - 212
  • [9] A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
    Dhananjay Thiruvady
    Mark Wallace
    Hanyu Gu
    Andreas Schutt
    [J]. Journal of Heuristics, 2014, 20 : 643 - 676
  • [10] A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
    Thiruvady, Dhananjay
    Wallace, Mark
    Gu, Hanyu
    Schutt, Andreas
    [J]. JOURNAL OF HEURISTICS, 2014, 20 (06) : 643 - 676