共 50 条
- [31] A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints [J]. OR Spectrum, 2020, 42 : 427 - 460
- [34] Genetic Algorithm for a Discrete-Continuous Project Scheduling Problem with Discounted Cash Flows [J]. 2015 20TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2015, : 52 - 57
- [39] A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (04): : 347 - 360