Factors Engendering Cost Misrepresentation of Public Sector Projects in Ghana

被引:0
|
作者
Asiedu, Richard O. [1 ]
Alfen, Hans W. [1 ]
机构
[1] Bauhaus Univ, Chair Construct Econ, Weimar, Germany
关键词
cost overrun; frequency indices; public sector projects; severity indices; relative importance indices;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The main purpose of this research was to identify the core factors that engender construction cost overruns in public buildings in Ghana. Adopting a positivist, realist and value free philosophical approach, the research employs a multiple research strategy emphasized by the funnel technique principle. Twenty two dominant factors generated from a combination of exploratory interviews and extensive literature in the context of GCI was designed into a structured questionnaire targeting 240 clients, consultants and contractors. With a 55% return rate, the response of the participants were analysed using a combination of severity, frequency and relative importance indices. The five most important factors according to all three participants are (1) delay and uncertainty surrounding payment for work done (2) lack of enforcement of contract provisions by parties (3) variations and additional works resulting from changes in site conditions (4) lapses and challenges within PPL (5) excessive material and labour price fluctuations. Even though the Spearman's rank correlation test showed a strong agreement between clients and consultants, there was however a weak correlation between clients and contractors and consultants and contractors which is normal considering the allegations and counter-allegations regarding each other's contribution towards cost overruns. However a fair degree of objectivity and validity can be credited to the results considering the average level of experience of the respondents in the GCI.
引用
收藏
页码:13 / 24
页数:12
相关论文
共 50 条
  • [1] Modelling construction completion cost in Ghana public sector building projects
    Coffie G.H.
    Aigbavboa C.O.
    Thwala W.D.
    [J]. Asian Journal of Civil Engineering, 2019, 20 (7) : 1063 - 1070
  • [2] Risk factors contributing to cost overruns in implementing public sector projects in China
    Shen, LY
    Deng, XP
    [J]. PROCEEDINGS OF CRIOCM 2005 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2005, : 513 - 520
  • [3] COST AND TIME OVERRUNS IN PUBLIC-SECTOR PROJECTS
    MORRIS, S
    [J]. ECONOMIC AND POLITICAL WEEKLY, 1990, 25 (47) : M154 - M168
  • [4] Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. PUBLIC ORGANIZATION REVIEW, 2023, 23 (03) : 1105 - 1126
  • [5] Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects
    Francisco Pinheiro Catalão
    Carlos Oliveira Cruz
    Joaquim Miranda Sarmento
    [J]. Public Organization Review, 2023, 23 : 1105 - 1126
  • [6] Identification and Assessment of Uncertainty Factors that Influence the Transaction Cost in Public Sector Construction Projects in Pakistan
    Ali, Zaigham
    Zhu, Fangwei
    Hussain, Shahid
    [J]. BUILDINGS, 2018, 8 (11)
  • [7] Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana
    Nuako, Francis
    Ghansah, Frank Ato
    Adusei, Thomas
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [8] Factors for Time and Cost Overrun in Public Projects
    Idrees, Shehryar
    Shafiq, Muhammad Tariq
    [J]. Journal of Engineering, Project, and Production Management, 2021, 11 (03) : 243 - 254
  • [9] Cost and distribution of bids for asbestos abatement projects in the public sector
    Lange, JH
    [J]. INDOOR AND BUILT ENVIRONMENT, 2000, 9 (3-4) : 201 - 206
  • [10] Time-cost relationship of public sector projects in Malaysia
    Chan, Albert P.C.
    [J]. 2001, Elsevier Ltd (19)