Time-cost relationship of public sector projects in Malaysia

被引:57
|
作者
Chan, Albert P.C. [1 ]
机构
[1] Department of Building and Real Estate, Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
关键词
D O I
10.1016/S0263-7863(99)00072-1
中图分类号
学科分类号
摘要
29
引用
收藏
相关论文
共 50 条
  • [1] Risk-Informed Time-Cost Relationship Models for Sanitation Projects
    Sousa, Vitor
    Almeida, Nuno Marques
    Dias, Luis Alves
    Branco, Fernando Antonio
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (05)
  • [2] COST AND TIME OVERRUNS IN PUBLIC-SECTOR PROJECTS
    MORRIS, S
    [J]. ECONOMIC AND POLITICAL WEEKLY, 1990, 25 (47) : M154 - M168
  • [3] Time-cost model for building projects in Nigeria
    Ogunsemi, D. R.
    Jagboro, G. O.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (03) : 253 - 258
  • [4] Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location
    Dursun, Onur
    Stoy, Christian
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (01) : 97 - 106
  • [5] An evaluation of construction time performance of public sector civil engineering projects in Malaysia
    Othman, AA
    Torrance, JV
    Hamid, MA
    [J]. PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 381 - 388
  • [6] TIME-COST TRADEOFFS IN UNCERTAIN EMPIRICAL RESEARCH PROJECTS
    SCHERER, FM
    [J]. NAVAL RESEARCH LOGISTICS QUARTERLY, 1966, 13 (01): : 71 - &
  • [7] Time-cost relationships in Australian building construction projects
    Love, PED
    Tse, RYC
    Edwards, DJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (02) : 187 - 194
  • [8] Research on Time-Cost Optimization Model of Construction Projects
    Huang, Jian-wen
    Wang, Xing-xia
    Zhou, Yi-hong
    Huang, Jian-wen
    Wang, Xing-xia
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7710 - +
  • [9] Cost-time performance of public sector housing projects in Nigeria
    Okuwoga, AA
    [J]. HABITAT INTERNATIONAL, 1998, 22 (04) : 389 - 395
  • [10] Time-cost relationship for predicting construction duration
    Czarnigowska, A.
    Sobotka, A.
    [J]. ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2013, 13 (04) : 518 - 526