Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location

被引:13
|
作者
Dursun, Onur [1 ]
Stoy, Christian [1 ]
机构
[1] Univ Stuttgart, Inst Construct Econ, Stuttgart, Germany
关键词
Bromilow's time-cost model; categorization; project location; F-ratio;
D O I
10.1080/01446193.2010.528437
中图分类号
F [经济];
学科分类号
02 ;
摘要
Construction duration is one of the key elements to determine the success of a project. Several models have been developed to provide precise predictions of construction duration. The datasets in previous studies comprise observations from particular countries. This precludes examination of the role of project location at the country level for modelling construction duration. The aim, therefore, is to test the statistical adequacy of categorizing projects with respect to their locations for modelling construction duration. A formal procedure to evaluate the adequacy of categorizing observations is also presented. It is intended to contribute to the epistemology of modelling construction duration. The dataset was generated from a global client. It contains information on 246 projects from 25 different countries. This creates a categorical variable for location. Bromilow's time-cost model is chosen to assess the adequacy of this categorization. A full model with indicator and interaction variables is compared to a restricted one. Parameter estimation was performed according to the ordinary least squares method. F-statistics are calculated and the probability of the value is significant. The results show that two distinct groups with substantial changes in model parameters exist in the dataset. It is also noted that conclusions are valid over the selected population.
引用
收藏
页码:97 / 106
页数:10
相关论文
共 50 条
  • [1] Time-cost model for building projects in Nigeria
    Ogunsemi, D. R.
    Jagboro, G. O.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (03) : 253 - 258
  • [2] Time-cost relationships in Australian building construction projects
    Love, PED
    Tse, RYC
    Edwards, DJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (02) : 187 - 194
  • [3] Time-cost relationship of public sector projects in Malaysia
    Chan, Albert P.C.
    [J]. 2001, Elsevier Ltd (19)
  • [4] Time-cost relationships of building construction project in Korea
    Le-Hoai, Long
    Lee, Young Dai
    [J]. FACILITIES, 2009, 27 (13-14) : 549 - 559
  • [5] Risk-Informed Time-Cost Relationship Models for Sanitation Projects
    Sousa, Vitor
    Almeida, Nuno Marques
    Dias, Luis Alves
    Branco, Fernando Antonio
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (05)
  • [6] Project time-cost optimization with the purchase time method
    ASA
    [J]. Cost Eng (Morgantown WVa), 7 (33-40):
  • [7] TIME-COST TRADEOFFS IN UNCERTAIN EMPIRICAL RESEARCH PROJECTS
    SCHERER, FM
    [J]. NAVAL RESEARCH LOGISTICS QUARTERLY, 1966, 13 (01): : 71 - &
  • [8] Research on Time-Cost Optimization Model of Construction Projects
    Huang, Jian-wen
    Wang, Xing-xia
    Zhou, Yi-hong
    Huang, Jian-wen
    Wang, Xing-xia
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7710 - +
  • [9] Time-cost tradeoff analysis with minimized project financing cost
    Alavipour, S. M. Reza
    Arditi, David
    [J]. AUTOMATION IN CONSTRUCTION, 2019, 98 : 110 - 121
  • [10] Time-cost relationship for predicting construction duration
    Czarnigowska, A.
    Sobotka, A.
    [J]. ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2013, 13 (04) : 518 - 526