Time-cost relationships in Australian building construction projects

被引:68
|
作者
Love, PED [1 ]
Tse, RYC
Edwards, DJ
机构
[1] Edith Cowan Univ, Fac Business & Publ Management, Sch Management Informat Syst, We B Ctr, Perth, WA 6027, Australia
[2] Hong Kong Inst Real Estate, Hong Kong, Hong Kong, Peoples R China
[3] Loughborough Univ Technol, OPERC, Dep Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
关键词
Australia; Construction industry; Costs; Project management; Time factors: Least-squares method;
D O I
10.1061/(ASCE)0733-9364(2005)131:2(187)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project time-cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the Multiple regression technique of weighted least squares. The ana-lysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of Lime performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are, also presented.
引用
收藏
页码:187 / 194
页数:8
相关论文
共 50 条
  • [1] Time-cost relationships of building construction project in Korea
    Le-Hoai, Long
    Lee, Young Dai
    [J]. FACILITIES, 2009, 27 (13-14) : 549 - 559
  • [2] The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects
    Vitor Sousa
    Inês Meireles
    [J]. Water Resources Management, 2018, 32 : 2753 - 2766
  • [3] The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects
    Sousa, Vitor
    Meireles, Ines
    [J]. WATER RESOURCES MANAGEMENT, 2018, 32 (08) : 2753 - 2766
  • [4] Time-cost model for building projects in Nigeria
    Ogunsemi, D. R.
    Jagboro, G. O.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (03) : 253 - 258
  • [5] Research on Time-Cost Optimization Model of Construction Projects
    Huang, Jian-wen
    Wang, Xing-xia
    Zhou, Yi-hong
    Huang, Jian-wen
    Wang, Xing-xia
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7710 - +
  • [6] Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
    Ezeldin, A. Samer
    Soliman, Ahmed
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (01) : 42 - 55
  • [7] Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects
    Li, Ming
    Wu, Guangdong
    [J]. ABSTRACT AND APPLIED ANALYSIS, 2014,
  • [8] Time-cost optimization of construction projects with generalized activity constraints
    Chassiakos, AP
    Sakellaropoulos, SP
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (10) : 1115 - 1124
  • [9] Time-cost optimization using harmony search algorithm in construction projects
    Zalmai, Lemar Mohammad
    Akcay, Cemil
    Manisali, Ekrem
    [J]. REVISTA DE LA CONSTRUCCION, 2019, 18 (02): : 226 - 237
  • [10] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Heravi, Gholamreza
    Moridi, Saeed
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (08) : 3265 - 3274