Time-cost relationships in Australian building construction projects

被引:68
|
作者
Love, PED [1 ]
Tse, RYC
Edwards, DJ
机构
[1] Edith Cowan Univ, Fac Business & Publ Management, Sch Management Informat Syst, We B Ctr, Perth, WA 6027, Australia
[2] Hong Kong Inst Real Estate, Hong Kong, Hong Kong, Peoples R China
[3] Loughborough Univ Technol, OPERC, Dep Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
关键词
Australia; Construction industry; Costs; Project management; Time factors: Least-squares method;
D O I
10.1061/(ASCE)0733-9364(2005)131:2(187)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project time-cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the Multiple regression technique of weighted least squares. The ana-lysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of Lime performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are, also presented.
引用
收藏
页码:187 / 194
页数:8
相关论文
共 50 条
  • [41] Systematic Review of the Time-Cost Optimization Models in Construction Management
    ElSahly, Osama Mohamed
    Ahmed, Salma
    Abdelfatah, Akmal
    [J]. SUSTAINABILITY, 2023, 15 (06)
  • [42] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [43] Two-Phase Differential Evolution for the Multiobjective Optimization of Time-Cost Tradeoffs in Resource-Constrained Construction Projects
    Cheng, Min-Yuan
    Duc-Hoc Tran
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2014, 61 (03) : 450 - 461
  • [44] Critical cost factors of building construction projects in Malaysia
    Toh, Tien-Choon
    Ting, Connie
    Ali, Kherun-Nita
    Aliagha, Godwin-Uche
    Munir, Omar
    [J]. INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT, 2012, 57 : 360 - 367
  • [45] A heuristic procedure for solving discrete time-cost tradeoff problems in repetitive projects
    Zhang, Qian
    Zou, Xin
    [J]. 2018 INTERNATIONAL CONFERENCE ON COMPUTER INFORMATION SCIENCE AND APPLICATION TECHNOLOGY, 2019, 1168
  • [46] Labour productivity in Australian building construction projects: a roadmap for improvement
    Nasirzadeh, Farnad
    Rostamnezhad, Mozhdeh
    Carmichael, David G.
    Khosravi, Abbas
    Aisbett, Brad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (11) : 2079 - 2088
  • [47] Modeling construction time in Spanish building projects
    Guerrero, Miguel A.
    Villacampa, Yolanda
    Montoyo, Andres
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 861 - 873
  • [48] COST AND TIME-COST EFFECTIVENESS OF MULTIPROCESSING
    SARKAR, D
    [J]. IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 1993, 4 (06) : 704 - 712
  • [49] Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance
    Hwang, Bon-Gang
    Zhu, Lei
    Wang, Yinglin
    Cheong, Xinyi
    [J]. PROJECT MANAGEMENT JOURNAL, 2017, 48 (04) : 67 - 79
  • [50] Time - Cost relationships for superstructure projects in Turkey
    Sönmez M.
    Di̇Kmen S.Ü.
    Akbiyikli R.
    [J]. Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2020, 31 (02): : 9869 - 9896