摘要
Evaluating to what extent a component or building system should be produced off-site is inadequate within the industry. The potential benefits of off-site production (OSP) are commonly cited when justifying an OSP approach, yet holistic and methodical assessments of the applicability and overall benefit of these solutions, to a particular project, have been found to be deficient. Common methods of evaluation simply take material, labour and transportation costs into account when comparing various options, often disregarding other costrelated items such as site facilities, crane use and rectification of works. These cost factors are usually buried within the nebulous preliminaries figure, with little reference to the building approach taken. Further, softer issues such as health and safety, effects on management and process benefits are either implicit or disregarded within these comparison exercises. Yet it is demonstrated that these issues are some of the most significant benefits of OSP. A series of case studies demonstrated that evaluation focus is almost solely on direct material and labour costs of components, without explicit regard for the wider cost or soft issue implications of OSP on a project. The paper argues that until evaluation is more holistic and value-based rather than cost-based, OSP uptake in construction will be slow.
引用
收藏
页码:121 / 130
页数:10
相关论文
共 50 条
  • [41] Off-Site Construction Planning Using Discrete Event Simulation
    Alvanchi, Amin
    Azimi, Reza
    Lee, SangHyun
    AbouRizk, Simaan M.
    Zubick, Paul
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02) : 114 - 122
  • [42] Off-site construction with 3D concrete printing
    Ter Haar, Bjorn
    Kruger, Jacques
    van Zijl, Gideon
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 152
  • [43] The construction project for the exportability and assembly of the building system on/off-site
    Belpoliti, Vittorino
    Calzolari, Marta
    Davoli, Pietromaria
    Guerzoni, Giampaolo
    [J]. TECHNE-JOURNAL OF TECHNOLOGY FOR ARCHITECTURE AND ENVIRONMENT, 2019, 18 : 309 - 320
  • [44] Helping civil engineers to realise the benefits of off-site construction
    White, Gavin
    Mather, Andrew
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2018, 171 (03) : 101 - 101
  • [45] Off-site focus
    [J]. Concrete Engineering International, 1998, 2 (06):
  • [46] Off-site focus
    [J]. Concr Eng Int, 8 (03):
  • [47] Off-site biomechanical evaluation of electricity linesmen tasks
    May, D
    White, R
    Graves, RJ
    Wright, EM
    [J]. CONTEMPORARY ERGONOMICS 1997, 1997, : 395 - 400
  • [48] Towards a more extensive application of off-site construction: a technological review
    Hou, Lei
    Tan, Yongtao
    Luo, Wenkai
    Xu, Sheng
    Mao, Chao
    Moon, Sungkon
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (11) : 2154 - 2165
  • [49] Effect of stakeholder collaborative management on off-site construction cost performance
    Xue, Hong
    Zhang, Shoujian
    Su, Yikun
    Wu, Zezhou
    Yang, Rebecca Jing
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 184 : 490 - 502
  • [50] Identification of Contractual and Financial Dispute Causes in the Off-Site Construction Projects
    Yildiran, Merve Pelinsu
    Demirdogen, Gokhan
    [J]. BUILDINGS, 2024, 14 (08)