Benefit evaluation for off-site production in construction

被引:204
|
作者
Blismas, Nick [1 ]
Pasquire, Christine [2 ]
Gibb, Alistair [2 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, City Campus,GPO Box 2476V, Melbourne, Vic 3001, Australia
[2] Univ Loughborough, Dept Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
关键词
Benefits; evaluation; off-site production; pre-assembly; value;
D O I
10.1080/01446190500184444
中图分类号
F [经济];
学科分类号
02 ;
摘要
Evaluating to what extent a component or building system should be produced off-site is inadequate within the industry. The potential benefits of off-site production (OSP) are commonly cited when justifying an OSP approach, yet holistic and methodical assessments of the applicability and overall benefit of these solutions, to a particular project, have been found to be deficient. Common methods of evaluation simply take material, labour and transportation costs into account when comparing various options, often disregarding other costrelated items such as site facilities, crane use and rectification of works. These cost factors are usually buried within the nebulous preliminaries figure, with little reference to the building approach taken. Further, softer issues such as health and safety, effects on management and process benefits are either implicit or disregarded within these comparison exercises. Yet it is demonstrated that these issues are some of the most significant benefits of OSP. A series of case studies demonstrated that evaluation focus is almost solely on direct material and labour costs of components, without explicit regard for the wider cost or soft issue implications of OSP on a project. The paper argues that until evaluation is more holistic and value-based rather than cost-based, OSP uptake in construction will be slow.
引用
收藏
页码:121 / 130
页数:10
相关论文
共 50 条
  • [21] Understanding off-site readiness in Indian construction organisations
    Bendi, Deepthi
    Rana, Muhammad Qasim
    Arif, Mohammed
    Goulding, Jack Steven
    Kaushik, Amit Kant
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (01): : 105 - 122
  • [22] Off-Site Construction in Saudi Arabia: The Way Forward
    Aburas, Hani
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2011, 17 (04) : 122 - 124
  • [23] Linking employee empowerment with productivity in off-site construction
    Alazzaz, Faisal
    Whyte, Andrew
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (01) : 21 - 37
  • [24] Construction Technology of Off-Site Precast Concrete Buildings
    Ting Gong
    Jian Yang
    Hao Hu
    Feng Xu
    [J]. Frontiers of Engineering Management, 2015, 2 (02) : 122 - 124
  • [25] Promoting Off-Site Construction: Future Challenges and Opportunities
    Arif, Mohammed
    Goulding, Jack
    Rahimian, Farzad Pour
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02) : 75 - 78
  • [26] Examining Off-Site Construction from a Flow Viewpoint
    da Rocha, Cecilia Gravina
    Wijayaratna, Kasun
    Jong, Kase
    Haller, David
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (03)
  • [27] Evaluation of the off-site preanaesthetic consult in Lorraine
    Rollin, M.
    Klecthka, P.
    Rat, A. -C.
    Laxenaire, M. -C.
    Mertes, P. -M.
    Bouaziz, H.
    [J]. ANNALES FRANCAISES D ANESTHESIE ET DE REANIMATION, 2006, 25 (09): : 927 - 934
  • [28] An off-site construction readiness maturity model for the Indian construction sector
    Bendi, Deepthi
    Rana, Muhammad Qasim
    Arif, Mohammed
    Goulding, Jack Steven
    Sawhney, Anil
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (01): : 123 - 142
  • [29] A Sustainability Assessment Framework for On-Site and Off-Site Construction Logistics
    Brusselaers, Nicolas
    Fufa, Selamawit Mamo
    Mommens, Koen
    [J]. SUSTAINABILITY, 2022, 14 (14)
  • [30] Evaluation of Lean Off-Site Construction Literature through the Lens of Industry 4.0 and 5.0
    Hadi, Ali
    Cheung, Franco
    Adjei, Solomon
    Dulaimi, Anmar
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (12)