共 50 条
- [1] FURNACE COMPUTER CONTROL OF PLATE MILL AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S324 - S324
- [2] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI STEEL CORP .2. THE DEVELOPMENT OF CERAMICS INSULATION METHODS IN CONTINUOUS REHEATING FURNACE [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1182 - 1182
- [3] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .1. MODIFICATION AND OPERATION OF REHEATING FURNACE AT NO 2 HOT STRIP MILL IN CHIBA WORKS, KAWASAKI STEEL CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1196 - 1196
- [4] APPLICATION OF HOT SKID AND KS BURNER FOR CONTINUOUS REHEATING FURNACE AT MIZUSHIMA BAR AND ROD MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S343 - S343
- [5] INTEGRATED OPERATION SYSTEM OF COKEMAKING PROCESS AT CHIBA WORKS OF KAWASAKI-STEEL-CORP [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1989, 86 (09): : 675 - 685
- [6] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
- [7] EFFECT OF COIL BOX INSTALLED INTO CHIBA NO 2 HOT STRIP MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S376 - S376
- [9] CHARACTERISTICS AND OPERATION OF NO 6 PICKLING LINE AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1191 - 1191
- [10] ENERGY SAVING OPERATION IN SINTER PLANT OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S837 - S837