共 50 条
- [1] INTEGRATED OPERATION SYSTEM OF COKEMAKING PROCESS AT CHIBA WORKS OF KAWASAKI-STEEL-CORP [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1989, 86 (09): : 675 - 685
- [2] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
- [5] ENERGY SAVING OPERATION IN SINTER PLANT OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S837 - S837
- [6] TECHNICAL DEVELOPMENT IN CONTINUOUS ANNEALING LINE AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. CHARACTERISTICS AND OPERATION OF CONTINUOUS ANNEALING LINE AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1062 - 1062
- [7] FURNACE COMPUTER CONTROL OF PLATE MILL AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S324 - S324
- [8] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181
- [9] OPERATION OF HOT METAL PRETREATMENT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S273 - S273
- [10] TECHNICAL DEVELOPMENT IN CONTINUOUS ANNEALING LINE AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .3. CHARACTERISTICS OF PROPERTIES ON DRAWABLE COLD ROLL SHEET PRODUCED IN MIZUSHIMA CONTINUOUS ANNEALING LINE, KAWASAKI-STEEL-CORP [J]. TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 25 (06) : B194 - B194