共 50 条
- [1] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
- [3] CHARACTERISTICS AND OPERATION OF NO 6 PICKLING LINE AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1191 - 1191
- [4] ENERGY SAVING OPERATION IN SINTER PLANT OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S837 - S837
- [5] FURNACE COMPUTER CONTROL OF PLATE MILL AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S324 - S324
- [6] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181
- [7] OPERATION OF HOT METAL PRETREATMENT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S273 - S273
- [9] PROCESS COMPUTER-SYSTEM OF THE BAR AND ROD MILL AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S383 - S383
- [10] SYNCHRONIZED OPERATION SYSTEM BETWEEN STEELMAKING AND HOT-ROLLING AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S369 - S369