共 15 条
- [1] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181
- [2] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .1. MODIFICATION AND OPERATION OF REHEATING FURNACE AT NO 2 HOT STRIP MILL IN CHIBA WORKS, KAWASAKI STEEL CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1196 - 1196
- [3] CONSTRUCTION OF THE NEW REHEATING FURNACE AT KIMITSU PLATE MILL, NIPPON-STEEL-CORP .2. COMBUSTION CONTROL-SYSTEM OF THE NEW REHEATING FURNACE IN PLATE MILL [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S321 - S321
- [4] FURNACE COMPUTER CONTROL OF PLATE MILL AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S324 - S324
- [5] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .2. DEVELOPMENT OF SLAB UNIFORM HEATING TECHNIQUES [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1197 - 1197
- [6] CONSTRUCTION OF THE NEW REHEATING FURNACE AT KIMISTU PLATE MILL, NIPPON-STEEL-CORP .1. OUTLINE OF THE HIGH EFFICIENT REHEATING FURNACE WITH LOW HEAT INERTIA [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S320 - S320
- [7] APPLICATION OF HOT SKID AND KS BURNER FOR CONTINUOUS REHEATING FURNACE AT MIZUSHIMA BAR AND ROD MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S343 - S343
- [8] DEVELOPMENT OF CARBONIZED CHROMIUM CERAMICS AND ITS PROPERTIES .2. RESULTS OF APPLYING CERAMICS TO THE SKID BUTTON OF CONTINUOUS REHEATING FURNACE [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1620 - 1620
- [9] TECHNICAL DEVELOPMENT IN PLATE MILL CONTROL-SYSTEM AT KASHIMA STEEL WORKS, SUMITOMO-METAL-INDUSTRIES-LTD .2. COMPUTER CONTROL-SYSTEM FOR REHEATING FURNACE [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1180 - 1180
- [10] CONSTRUCTION AND OPERATION OF LADLE FURNACE FACILITIES IN NO 2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S247 - S247