共 30 条
- [22] CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT EQUIPMENT [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S213 - S213
- [24] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. IMPROVEMENT OF OPERATIONAL CONDITIONS AND QUALITY OF PRODUCTS [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S153 - S153
- [26] MODIFICATION OF FINISHING TRAIN AT NO-2 HOT STRIP MILL, CHIBA WORKS, KAWASAKI-STEEL-CORP .1. WORK ROLL SHIFT MILL AND ITS ACTUAL OPERATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1220 - 1220
- [27] CONSTRUCTION OF THE NEW REHEATING FURNACE AT KIMISTU PLATE MILL, NIPPON-STEEL-CORP .1. OUTLINE OF THE HIGH EFFICIENT REHEATING FURNACE WITH LOW HEAT INERTIA [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S320 - S320
- [28] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI STEEL CORP .2. THE DEVELOPMENT OF CERAMICS INSULATION METHODS IN CONTINUOUS REHEATING FURNACE [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1182 - 1182
- [29] CONSTRUCTION OF FULLY CONTINUOUS COLD-ROLLING MILL FOR ULTRA-THIN GAUGE STEEL STRIP .1. ACCURACY OF SET-UP MODEL IN 6T-CM OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1158 - 1158
- [30] TECHNICAL DEVELOPMENT IN PLATE MILL CONTROL-SYSTEM AT KASHIMA WORKS, SUMITOMO METAL INDUSTRIES, LTD .1. NEW PROCESS-CONTROL SYSTEM FOR PLATE MILL USING MICRO COMPUTER [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1186 - 1186