共 24 条
- [1] MODIFICATION OF FINISHING TRAIN AT NO-2 HOT STRIP MILL, CHIBA WORKS, KAWASAKI-STEEL-CORP .2. CONTROL-SYSTEM AND CONTROL EFFECT FOR WORK ROLL SHIFT MILL [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1221 - 1221
- [2] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .1. MODIFICATION AND OPERATION OF REHEATING FURNACE AT NO 2 HOT STRIP MILL IN CHIBA WORKS, KAWASAKI STEEL CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1196 - 1196
- [3] EFFECT OF COIL BOX INSTALLED INTO CHIBA NO 2 HOT STRIP MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S376 - S376
- [5] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181
- [6] RECONSTRUCTION OF OITA HOT STRIP MILL, NIPPON-STEEL-CORP .2. APPLICATION OF WORK ROLL SHIFT TO HOT STRIP MILL IN OITA WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1219 - 1219
- [8] ANALYSIS OF ROLL CHOCK STRENGTH AND BEARING LOAD DISTRIBUTION AT MIZUSHIMA HOT STRIP MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S386 - S386