共 50 条
- [41] COST-ANALYSIS OF A 2-UNIT PRIORITY STANDBY SYSTEM WITH IMPERFECT SWITCH AND ARBITRARY DISTRIBUTIONS MICROELECTRONICS AND RELIABILITY, 1985, 25 (01): : 65 - 69
- [43] COST-ANALYSIS OF A 2-UNIT STANDBY REDUNDANT ELECTRONIC SYSTEM WITH CRITICAL HUMAN ERRORS MICROELECTRONICS AND RELIABILITY, 1986, 26 (05): : 841 - 846
- [46] COST-ANALYSIS OF A 2-UNIT CHARGEABLE STANDBY SYSTEM WITH INTERCHANGEABLE UNITS AND 2 TYPES OF FAILURE MICROELECTRONICS AND RELIABILITY, 1992, 32 (06): : 775 - 779
- [47] COST-ANALYSIS OF A 2-UNIT WARM STANDBY RELIABILITY SYSTEM WITH 2 TYPES OF REPAIR FACILITIES MICROELECTRONICS AND RELIABILITY, 1985, 25 (04): : 681 - 689
- [48] COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH DELAYED REPLACEMENT AND BETTER UTILIZATION OF UNITS MICROELECTRONICS AND RELIABILITY, 1985, 25 (01): : 81 - 86