共 50 条
- [31] COST-BENEFIT ANALYSIS OF A ONE-SERVER 2-UNIT COLD STANDBY SYSTEM WITH REPAIR AND AGE REPLACEMENT MICROELECTRONICS AND RELIABILITY, 1985, 25 (05): : 977 - 990
- [34] COST-BENEFIT-ANALYSIS OF A MULTICOMPONENT STANDBY SYSTEM WITH INSPECTION AND SLOW SWITCH MICROELECTRONICS AND RELIABILITY, 1986, 26 (05): : 879 - 882
- [35] COST-ANALYSIS IN A 2-UNIT STANDBY SYSTEM WITH A REGULAR REPAIRMAN AND PATIENCE TIME MICROELECTRONICS AND RELIABILITY, 1984, 24 (03): : 453 - 459
- [37] COST-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH 2 TYPES OF OPERATION AND REPAIR MICROELECTRONICS AND RELIABILITY, 1985, 25 (01): : 71 - 75
- [38] ANALYSIS OF A 2-UNIT HOT STANDBY SYSTEM WITH 3 MODES MICROELECTRONICS AND RELIABILITY, 1983, 23 (06): : 1029 - 1033
- [39] ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH 3 MODES MICROELECTRONICS AND RELIABILITY, 1983, 23 (06): : 1041 - 1044
- [40] GERT ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH REPAIR MICROELECTRONICS AND RELIABILITY, 1995, 35 (05): : 837 - 840