共 50 条
- [21] COST-BENEFIT-ANALYSIS OF A ONE-SERVER 2-UNIT IMPERFECT SWITCH SYSTEM WITH DELAYED REPAIR MICROELECTRONICS AND RELIABILITY, 1985, 25 (05): : 865 - 867
- [22] COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH 2 TYPES OF REPAIRMEN MICROELECTRONICS AND RELIABILITY, 1984, 24 (05): : 849 - 855
- [24] SYSTEM CHARACTERISTIC AND COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH SPARE UNITS MICROELECTRONICS AND RELIABILITY, 1995, 35 (04): : 691 - 698
- [26] COST-BENEFIT-ANALYSIS OF ONE-SERVER 2-UNIT SYSTEM SUBJECT TO SLOW SWITCH AND RANDOM SERVICE MICROELECTRONICS AND RELIABILITY, 1985, 25 (01): : 183 - 194
- [27] COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM UNDER THE INFLUENCE OF EARTHQUAKES MICROELECTRONICS AND RELIABILITY, 1994, 34 (04): : 735 - 739
- [28] COST-BENEFIT-ANALYSIS OF A ONE-SERVER 2-UNIT STANDBY SYSTEM SUBJECT TO IMPERFECT SWITCHING DEVICE, RANDOM INSPECTION AND K-FAILURE MODES MICROELECTRONICS AND RELIABILITY, 1986, 26 (01): : 7 - 11
- [29] COST-BENEFIT-ANALYSIS OF ONE-SERVER 2-UNIT IMPERFECT SWITCH SYSTEM SUBJECT TO MULTISTAGE REPAIRS MICROELECTRONICS AND RELIABILITY, 1985, 25 (03): : 541 - 548
- [30] COST-ANALYSIS FOR 2-UNIT WARM STANDBY SYSTEMS MICROELECTRONICS AND RELIABILITY, 1992, 32 (08): : 1079 - 1081