共 50 条
- [1] Method for calculating uplift of shield tunnels subjected to underlying grouting in soft clayey ground Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2024, 46 (11): : 2401 - 2409
- [2] Ground surface deformation caused by synchronous grouting of shield tunnels Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 (04): : 618 - 624
- [3] Application of jet grouting to join shield tunnels GROUTING AND DEEP MIXING, VOL 1, 1996, : 325 - 328
- [4] GROUND SETTLEMENT ABOVE SHIELD DRIVEN TUNNELS IN CLAY. Tunnels and Tunnelling, 1975, 7 (01): : 58 - 59
- [5] Effective control of large transverse deformation of shield tunnels using grouting in soft deposits Zhang, Dong-Mei, 1600, Chinese Society of Civil Engineering (36):
- [6] Simulating Synchronous Grouting in Shield Tunnels with the Consideration of Evolution of Grouting Pressure PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: TUNNELLING AND UNDERGROUND CONSTRUCTION, 2018, : 23 - 31
- [7] Optimisation of Synchronous Grouting Mix Ratio for Shield Tunnels APPLIED SCIENCES-BASEL, 2024, 14 (10):
- [8] Research of affection to the ground on the metro station driven with enlarging shield tunnels ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2143 - +
- [9] Factors influencing the ground loss due to tunnels driven by EPB shield GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 209 - 212
- [10] Research of affection to the ground on the metro station driven with enlarging shield tunnels Appl. Mech. Mater., (2143-2146):