共 50 条
- [1] Optimisation of Synchronous Grouting Mix Ratio for Shield Tunnels APPLIED SCIENCES-BASEL, 2024, 14 (10):
- [3] Ground surface deformation caused by synchronous grouting of shield tunnels Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 (04): : 618 - 624
- [4] Theoretical study on synchronous grouting filling patterns and pressure distribution of EPB shield tunnels Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (11): : 1752 - 1757
- [5] Disturbance mechanical problems induced by synchronous grouting in deep shield tunnels Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 (05): : 855 - 863
- [6] Pressure Model Study on Synchronous Grouting in Shield Tunnels Considering the Temporal Variation in Grout Viscosity APPLIED SCIENCES-BASEL, 2023, 13 (18):
- [7] Grout pressure distribution characteristics in space-time domain of shield tunnels during synchronous grouting Huang, Linchong (hlinch@mail.sysu.edu.cn), 2018, Harbin Institute of Technology (50): : 165 - 170
- [8] Application of jet grouting to join shield tunnels GROUTING AND DEEP MIXING, VOL 1, 1996, : 325 - 328
- [10] Simplified Algorithm for Grouting Pressure and Grouting Quantity in Shield Construction International Journal of Civil Engineering, 2020, 18 : 419 - 428