Ground surface deformation caused by synchronous grouting of shield tunnels

被引:0
|
作者
Ye, Fei [1 ]
Gou, Chang-Fei [2 ]
Chen, Zhi [1 ]
Mao, Jia-Hua [1 ]
Yang, Peng-Bo [1 ]
Jia, Tao [1 ]
机构
[1] Chang'an University, Shaanxi Provincial Major Laboratory for Highway Bridge and Tunnel, Xi'an 710064, China
[2] Wenzhou Railway and Mass Transit Investment Group Co., Ltd., Wenzhou 325000, China
关键词
Mortar - Soils - Pressure effects - Concrete construction - Deformation - Shielding;
D O I
10.11779/CJGE201404004
中图分类号
学科分类号
摘要
The back-filled grouting is a key step in shield tunnel construction, which has a significant influence on controlling the ground surface deformation. For the purpose of establishing a calculation theory of the ground surface deformation caused by synchronous grouting, the pressure effect of synchronous grouting on the surrounding soils is simplified as an expansion problem of cylindrical cavity in semi-infinite elastic solid. Based on the mechanism analysis of synchronous grouting acting on the surrounding soils, a formula for calculating the ground surface deformation resulting from synchronous grouting is deduced by using the image method. Through a specific example, the influencing factors of the ground surface deformation caused by synchronous grouting are analyzed as well. The results show that the ground surface deformation caused by synchronous grouting is affected by many factors such as grouting pressure, tunnel depth, excavation radius, initial soil and water pressure, elastic modulus and Poisson's ratio of soils.
引用
收藏
页码:618 / 624
相关论文
共 50 条
  • [1] Simulating Synchronous Grouting in Shield Tunnels with the Consideration of Evolution of Grouting Pressure
    Qiao, Yafei
    Zhao, Tianchi
    Ding, Wenqi
    PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: TUNNELLING AND UNDERGROUND CONSTRUCTION, 2018, : 23 - 31
  • [2] Optimisation of Synchronous Grouting Mix Ratio for Shield Tunnels
    Zhou, Hongmei
    Zhang, Yixiang
    Zhu, Wanxu
    Zhong, Qingyu
    Huang, Xinyu
    APPLIED SCIENCES-BASEL, 2024, 14 (10):
  • [3] Disturbance mechanical problems induced by synchronous grouting in deep shield tunnels
    Ye F.
    Guo H.-W.
    Duan Z.-J.
    Liang X.
    Wang S.-Y.
    Wang B.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 (05): : 855 - 863
  • [4] LOW SLUMP COMPACTIVE TAIL SHIELD GROUTING IN SOFT GROUND, SHIELD DRIVEN TUNNELS
    RUGGIERO, JG
    JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1984, 81 (06): : 645 - 645
  • [5] Research on the Pressure Distribution Law of Synchronous Grouting in Shield Tunnels and the Force on Segments
    Cheng, Yang
    Liu, Xiangyang
    BUILDINGS, 2024, 14 (04)
  • [6] Optimizing Grouting Parameters to Control Ground Deformation in the Shield Tunneling
    Wang, Mei
    Zhao, Chenyue
    Yang, Songsong
    Xu, Jingmin
    BUILDINGS, 2024, 14 (09)
  • [7] Influence of the Ground Displacement and Deformation of Soil around a Tunnel Caused by Shield Backfilled Grouting during Construction
    Liu, Jian
    Song, Juan
    Zhang, Zaisong
    Hu, Nanqi
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (03)
  • [8] Theoretical study on synchronous grouting filling patterns and pressure distribution of EPB shield tunnels
    Li, Zhi-Ming
    Liao, Shao-Ming
    Dai, Zhi-Ren
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (11): : 1752 - 1757
  • [9] Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material
    Luo, Guijun
    Xiao, Chao
    Liu, Yuan
    Feng, Kejun
    Ren, Qingguo
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [10] Theoretical Model of Synchronous Grouting Longitudinal-Circumferential Integrated Diffusion of Shield Tunnels
    Li P.
    Shi L.
    Li X.
    Liu J.
    Tongji Daxue Xuebao/Journal of Tongji University, 2020, 48 (05): : 629 - 637