共 50 条
- [1] LOW SLUMP COMPACTIVE TAIL SHIELD GROUTING IN SOFT GROUND, SHIELD DRIVEN TUNNELS JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1984, 81 (06): : 645 - 645
- [2] Soil consolidation associated with grouting during shield tunnelling in soft clayey ground GEOTECHNIQUE, 2001, 51 (10): : 835 - 846
- [3] Soil consolidation associated with grouting during shield tunnelling in soft clayey ground GEOTECHNIQUE, 2003, 53 (04): : 447 - 448
- [4] Soil consolidation associated with grouting during shield tunnelling in soft clayey ground 2001, Thomas Telford Services Ltd (51):
- [7] Ground surface deformation caused by synchronous grouting of shield tunnels Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 (04): : 618 - 624
- [9] Experimental study of earth pressure on shield tunnels in clayey ground considering its permeability TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 121 - 125
- [10] Method of Calculating the Compensation for Rectifying the Horizontal Displacement of Existing Tunnels by Grouting APPLIED SCIENCES-BASEL, 2021, 11 (01): : 1 - 20