Variance models for project financial risk analysis with applications to greenfield BOT highway projects

被引:27
|
作者
Chiara, Nicola [1 ]
Garvin, Michael J. [2 ]
机构
[1] Columbia Univ, Dept Civil Engn & Engn Mech, New York, NY 10027 USA
[2] Virginia Tech, Myers Lawson Sch Construct, Blacksburg, VA USA
关键词
Build-operate-transfer; Monte Carlo simulation; risk analysis; stochastic models;
D O I
10.1080/01446190802259027
中图分类号
F [经济];
学科分类号
02 ;
摘要
Assessment of BOT project financial risk is generally performed by combining Monte Carlo simulation with discounted cash flow analysis. The outcomes of this risk assessment depend, to a significant extent, upon the total project uncertainty, which aggregates aleatory and epistemic uncertainties of key risk variables. Unlike aleatory uncertainty, modelling epistemic uncertainty is a rather difficult endeavour. In fact, BOT epistemic uncertainty may vary according to the significant information disclosed during the concession period. Two properties generally characterize the stochastic behaviour of the uncertainty of BOT epistemic variables: (1) the learning property and (2) the increasing uncertainty property. A new family of Markovian processes, the Martingale variance model and the general variance model, are proposed as an alternative modelling tool for BOT risk variables. Unlike current stochastic models, the proposed models can be adapted to incorporate a risk analyst's view of properties (1) and (2). A case study, a hypothetical BOT transportation project, illustrates that failing to properly model a project's epistemic uncertainty may lead to a biased estimate of the project's financial risk. The variance models may support, guide and extend the thinking process of risk analysts who face the challenging task of representing subjective assessments of key risk factors.
引用
下载
收藏
页码:925 / 939
页数:15
相关论文
共 50 条
  • [1] Revenue Risk Modelling and Assessment on BOT Highway Project
    Novianti, T.
    Setyawan, H. Y.
    2ND INTERNATIONAL JOINT CONFERENCE ON SCIENCE AND TECHNOLOGY (IJCST) 2017, 2018, 953
  • [2] Rapid risk analysis for highway BOT project using the data of feasibility report
    Zhang, Shi-Wen
    Liu, Xiao-Ming
    Beijing Gongye Daxue Xuebao / Journal of Beijing University of Technology, 2010, 36 (01): : 51 - 57
  • [3] Risk Analysis for a BOT Project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2011, 5 (03) : 330 - 342
  • [4] Decision Framework for Efficient Risk Mitigation in BOT Highway Infrastructure Service Projects
    Dhanshyam, Mahavadi
    Srivastava, Samir K.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (09)
  • [5] Model for Evaluating the Financial Viability of the BOT Project for Highway Service Areas in South Korea
    Jeong, Jaewook
    Ji, Changyoon
    Hong, Taehoon
    Park, Hyo Seon
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (02)
  • [6] Evaluation on Risk Analysis for Oversea BOT Project
    An Yuhua
    Ding Xiaoxin
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 221 - 225
  • [7] A method of risk analysis about BOT project
    Wang, XQ
    Geng, YS
    Fu, R
    PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 1715 - 1719
  • [8] Evaluation on Risk Analysis for Oversea BOT Project
    Zhang, Ximing
    An, Yuhua
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 428 - 431
  • [9] Price risk management in BOT railroad construction projects using financial derivatives
    Vahdatmanesh, Mohammad
    Firouzi, Afshin
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2018, 23 (03) : 349 - 362
  • [10] Applications of the integral project management in the construction industry Second part, highway projects
    Veas, L.
    Pradena, M.
    REVISTA DE LA CONSTRUCCION, 2010, 9 (02): : 89 - 96